Laserfiche WebLink
<br />CITY OF SUNNY ISLES BEACH <br />SECTION THREE: ADDITIONAL INFORMATION <br /> <br /> E, RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br />12. NAME 13, ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br /> Derrick Lewis, P .E. Stormwater Management .. TOTAL b. WITH CURRENT FIRM <br /> 13 years 3 years <br />I S. FIRM NAME AND LOCATION (City and State) <br />KEITH AND SCHNARS - Fort Lauderdale. FL <br />16. EDUCATION (DEGREE AND SPEClAUZA nON) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND <br />M,S., Transportation Engineering. Florida International University. DISCIPLINE) <br />2005 Registered Professional Engineer, FL #62965 <br />B.s, Civil Engineering, University of Central Florida. 1997 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> 19. RELEVANT PROJECTS <br /> (2) YEAR COMPLETED <br /> I) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If <br /> SW 24'h Street Coral Way (SR-972) Resurfacing & 2006 applicable) N/A <br /> Reconstruction <br />a Miami-Dade County, FL <br /> (3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE 00 Check if project performed with current firm <br /> As the Lead Drainage Engineer, Mr, Lewis was responsible for drainage design, permitting, plans production hydraulic modeling, and report writing. <br /> The project included 20 deep wells and required extensive coordination and interaction with DERM, FDEP, and SFWM, <br /> (2) YEAR COMPLETED <br /> (I) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If <br /> NW/NE 36th Street (SR-25) Reconstruction applicable) N/A <br /> Miami-Dade County. FL 2005 <br />b <br /> (3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE 00 Check if project performed with current firm <br /> As the Lead Drainage Engineer, Mr, Lewis was responsible for drainage design, permitting, plans production hydraulic modeling, and report writing, <br /> This project involved widening in segments and total reconstruction, The storm water management system included the 30 deep wells and required <br /> extensive coordination and interaction with DERM, FDEP, and SFWM, <br /> (2) YEAR COMPLETED <br /> (I) TITLE AND LOCATION (City and Stote) PROFESSIONAL SERVICES CONSTRUCTION (If <br /> SW 157th Street Widening & Reconstruction 2009 applicable) N/A <br /> Miami-Dade County <br />c <br /> (3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE 00 Check if project performed with current firm <br /> As the Lead Drainage Engineer, Mr, Lewis was responsible for drainage design, permitting, plans production hydraulic modeling, and report writing of <br /> the reconstruction and widening from a one lane road to a two lane road. , This project included 2 miles of exfiltration trench and required <br /> extensive coordination and interaction with DERM, FDEP, and SFWM, <br /> (2) YEAR COMPLETED <br /> (I) TITLE AND LOCATION (City and Stote) PROFESSIONAL SERVICES CONSTRUCTION (If <br /> Biscayne Boulevard (SR-5) Reconstruction & Pump Station 2006 applicable) N/A <br /> Miami-Dade County. FL <br />d <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 00 Check if project performed with current firm <br /> As the Lead Drainage Engineer, Mr. Lewis was responsible for drainage design, permitting, plans production hydraulic modeling, and report writing, <br /> The project included 30 deep wells and required extensive coordination and interaction with DERM, FDEP, and SFWM, <br /> <br />AUTHORIZED FOR lOCAl RE:PRODUCTION <br />MANDATORY USE DATE OF FORM 611004 <br /> <br />STANDARD FORM 330 (1/2004) PAGE 5 <br /> <br />RFQjtIO-04-01 <br /> <br />P AG E ] 5 <br /> <br />:l Yii~ KEITH and SCHNARS, P.A. <br />~ _~__} FLORJDAs Bjf lOCAL FIRM <br />--'--" <br />