|
<br />CITY OF SUNNY ISLES BEACH
<br />SECTION THREE: ADDITIONAL INFORMATION
<br />
<br /> E, RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.)
<br />12. NAME 13, ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br /> Derrick Lewis, P .E. Stormwater Management .. TOTAL b. WITH CURRENT FIRM
<br /> 13 years 3 years
<br />I S. FIRM NAME AND LOCATION (City and State)
<br />KEITH AND SCHNARS - Fort Lauderdale. FL
<br />16. EDUCATION (DEGREE AND SPEClAUZA nON) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND
<br />M,S., Transportation Engineering. Florida International University. DISCIPLINE)
<br />2005 Registered Professional Engineer, FL #62965
<br />B.s, Civil Engineering, University of Central Florida. 1997
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br /> 19. RELEVANT PROJECTS
<br /> (2) YEAR COMPLETED
<br /> I) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If
<br /> SW 24'h Street Coral Way (SR-972) Resurfacing & 2006 applicable) N/A
<br /> Reconstruction
<br />a Miami-Dade County, FL
<br /> (3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE 00 Check if project performed with current firm
<br /> As the Lead Drainage Engineer, Mr, Lewis was responsible for drainage design, permitting, plans production hydraulic modeling, and report writing.
<br /> The project included 20 deep wells and required extensive coordination and interaction with DERM, FDEP, and SFWM,
<br /> (2) YEAR COMPLETED
<br /> (I) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If
<br /> NW/NE 36th Street (SR-25) Reconstruction applicable) N/A
<br /> Miami-Dade County. FL 2005
<br />b
<br /> (3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE 00 Check if project performed with current firm
<br /> As the Lead Drainage Engineer, Mr, Lewis was responsible for drainage design, permitting, plans production hydraulic modeling, and report writing,
<br /> This project involved widening in segments and total reconstruction, The storm water management system included the 30 deep wells and required
<br /> extensive coordination and interaction with DERM, FDEP, and SFWM,
<br /> (2) YEAR COMPLETED
<br /> (I) TITLE AND LOCATION (City and Stote) PROFESSIONAL SERVICES CONSTRUCTION (If
<br /> SW 157th Street Widening & Reconstruction 2009 applicable) N/A
<br /> Miami-Dade County
<br />c
<br /> (3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE 00 Check if project performed with current firm
<br /> As the Lead Drainage Engineer, Mr, Lewis was responsible for drainage design, permitting, plans production hydraulic modeling, and report writing of
<br /> the reconstruction and widening from a one lane road to a two lane road. , This project included 2 miles of exfiltration trench and required
<br /> extensive coordination and interaction with DERM, FDEP, and SFWM,
<br /> (2) YEAR COMPLETED
<br /> (I) TITLE AND LOCATION (City and Stote) PROFESSIONAL SERVICES CONSTRUCTION (If
<br /> Biscayne Boulevard (SR-5) Reconstruction & Pump Station 2006 applicable) N/A
<br /> Miami-Dade County. FL
<br />d
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 00 Check if project performed with current firm
<br /> As the Lead Drainage Engineer, Mr. Lewis was responsible for drainage design, permitting, plans production hydraulic modeling, and report writing,
<br /> The project included 30 deep wells and required extensive coordination and interaction with DERM, FDEP, and SFWM,
<br />
<br />AUTHORIZED FOR lOCAl RE:PRODUCTION
<br />MANDATORY USE DATE OF FORM 611004
<br />
<br />STANDARD FORM 330 (1/2004) PAGE 5
<br />
<br />RFQjtIO-04-01
<br />
<br />P AG E ] 5
<br />
<br />:l Yii~ KEITH and SCHNARS, P.A.
<br />~ _~__} FLORJDAs Bjf lOCAL FIRM
<br />--'--"
<br />
|