Laserfiche WebLink
<br />CITY OF SUNNY ISLES BEACH <br />SECTION THREE: ADDITIONAL INFORMATION <br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />21. TITLE AND LOCATION (Ory and State) <br /> <br />River Oak,s - Edgewood Communities Stormwater <br />Analysis <br />Fort Lauderdale, FL <br /> <br />PROFESSIONAL <br />SERVICES <br />N/A <br /> <br />2 ,EXAMPt PRO) T K <br /> <br />U E' <br /> <br />7 <br /> <br />22. YEAR COMPLETED <br />CONSTRUCTION (If applicable) <br /> <br />N/A <br /> <br />a. PROJECT NAME <br />City of Ft, Lauderdale <br /> <br />23. PROJECT OWNER'S INFORMATION <br />c. POINT OF CONTACT NAME <br />Mehrdad Fayyaz <br /> <br />c, POINT OF CONTACT TELEPHONE NUMBER <br />(954) 828-6527 <br /> <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br />Individual street blocks within these areas were <br />analyzed to determine the extent of flooding <br />and where the flooding was the most <br />substantial. Five methods of providing drainage <br />relief were analyzed: roadside swales, exfiltration trench, dry retention ponds, injection wells and discharge into the New River <br />Canal. Injection wells were immediately ruled out since wells within this area would not be able to meet State standards. Keith <br />and Schnars also provided a cost estimate for each of the drainage methods and the corresponding flood protection being <br />provided for each. The cost estimate was prepared in a tiered format in order to show how each drainage method or <br />combination of drainage method or combination of drainage methods was reducing flooding and the cost for each. The costs <br />ranged from 461,000 to $2,8 million for River Oaks and from $886,000 to $1.3 million for Edgewood. <br /> <br />"i/iJ"~ <br /> <br /> <br />BASIN <br />F <br /> <br />" <br />: <br />._. t <br />...... <br />B~S '" <br />LJ <br /> <br />-=~l <br />~,;~T~[ .,- r\'~:: ._'. <br /> <br />.. ,,',---~ --. <br /> <br />g:l- - -..J .... L - ---.. <br />'--r\4' ..\_..,.-' ~L ---_ <br />t' ~-~~-'-~=') \~. <br />.:;-., -=+'-"1 ! <br />_","'::".~---l ._.. (=~' <br />BASIN f - :'-;' <br />B .~.- ~I : ~ <br />'- --' - ~..-=-- 'j <br /> <br />, <br />BASIN: <br />G <br /> <br />-,i <br />__ _ i\ <br />L=:\ <br />.~ <br />'----- <br />II ~""_. <br />I _'00; <br />1_:::,.":. . \" \ <br />l '\\ I <br />f BASin ~~.l <br />I '-"--1 <br />:.~~:,\ .. "'~-I <br />.~'L~_____/ _.-; <br /> <br />The implementation of the project is currently on hold pending funding. <br /> <br />Keith and Schnars prepared a drainage analysis <br />for the existing flooding problems within the <br />neighborhoods of River Oaks and Edgewood <br />located in the City of Fort lauderdale. The <br />contract for this study totaled $108,065 and <br />included a Master Storwmater Analysis, meeting <br />with governmental agencies to determine <br />permit requirements, a cost analysis, a projected <br />construction schedule and a topographic survey <br />to determine areas of flooding. <br /> <br />(I) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and Stote) <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br />(3) ROLE <br /> <br />a. <br /> <br />Keith and Schnars <br /> <br />Fort Lauderdale, FL <br /> <br />AUTHORIZED FOR lOCAL REPRODUCTION <br />MANDATORY USE DATE OF FORM 612004 <br /> <br />RFQ#tO-04-0t <br /> <br />PAGE 28 <br /> <br />Prime <br /> <br />STANDARD FORM 330 (112004) PAGE 18 <br /> <br />:: JI;, 'l'~ KEITH and SCHNARS, P.A. <br />:: ~,/ FLORIDA<; Bi!-lOCAL FIRM <br />-'- <br />