My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BCC Engineering
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-01) Prof. Engineering Svcs.
>
Responses
>
BCC Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2010 9:19:36 AM
Creation date
11/18/2010 9:19:18 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Engineering Svcs.
Bid No. (xx-xx-xx)
10-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br /> <br />21. TITLE AND LOCATION (City and State) <br /> <br />20, EXAMPLE PROJECT KEY NUMBER <br /> <br />1 <br /> <br />22. YEAR COMPLETED <br /> <br />General Engineering Services <br />eity of Miami, Florida <br /> <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />June 2008 (On Going) <br />23. PROJECT OWNER'S INFORMATION <br /> <br />a. PROJECT OWNER b. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NUMBER <br />City of Miami Jose lago, P.E. (305) 416-1252 <br />444 SW 2nd Avenue, Miami, Florida 33130 Jlago@ci.miamLfl.us <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope. size, and cost) <br />BCC Engineering was selected to provide General Engineering Services for the City of <br />Miami. One of the Assignments completed under this contract was: . '-'. <br /> <br />San Marco Island, City of Miami, Florida <br /> <br />Scope of work consisted of Roadway and Drainage improvements, including regarding <br />and repair of swales, replacement of damaged sidewalks, curb and gutter, milling and <br />resurfacing of roadways, construction of new ADA ramps, repair and replacement of <br />all traffic and street signs. <br />Engineering services provided included the analysis of alternative drainage <br />designs/systems that can be used to resolve flooding issues associated with San <br />Marcos Island. The analysis consists of performing preliminary hydraulic calculations <br />for each alternative considered using Advanced Interconnected Pond Routing Model <br />(AdICPR). Once a design alternative was reviewed and approved by the City, a <br />drainage design including drainage calculations, hydrologic/hydraulic modeling and <br />drainage design plans was prepared and submitted for approval. <br /> <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br />a. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE <br /> BCe Engineering, Inc. 7300 North Kendall Drive, Suite 400 Prime <br /> Miami, Florida 33156 <br />b. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE <br />c. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE <br />d. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE <br />e. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE <br />f. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE <br /> <br />STANDARD FORM 330 (6/2004) PAGE 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.