My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BCC Engineering
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-01) Prof. Engineering Svcs.
>
Responses
>
BCC Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2010 9:19:36 AM
Creation date
11/18/2010 9:19:18 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Engineering Svcs.
Bid No. (xx-xx-xx)
10-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br /> <br />21. TITLE AND LOCATION (City and State) <br /> <br />20, EXAMPLE PROJECT KEY NUMBER <br /> <br />3 <br /> <br />22. YEAR COMPLETED <br /> <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> <br />General Engineering Services, Miami-Dade County Water and Sewer Dept. <br />Miami-Dade County, Florida <br /> <br />2008 2010 <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />a. PROJECT OWNER b. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NUMBER <br />Miami-Dade County.WASD Felix Valdes (786) 552-8263 <br />3071 SW 38 Avenue, Miami, Florida 33146 FValdes@miamidade.gov <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br />BCC Engineering was selected to provide General Engineering Services for WASD. One of the Assignments completed under this <br />contract was: <br /> <br />Miami Shores and EI Portal Undersized Water Main Replacement <br /> <br />Scope of Services included the design of 2,200 LF 8" DIP water mains to <br />replace existing potable water system within the public right of way in the <br />City of Miami Shore and the Village of EI Portal. The project also includes the <br />installation of fire hydrants, consistent with County requirements and <br />standards. This system will improve the water pressure and fire protection <br />capabilities in the residential area. Responsibilities also include permitting <br />with Miami-Dade DERM, Miami-Dade Fire Department and the Florida <br />Department of Health. <br /> <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br />a. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE <br /> BCC Engineering, Inc. 7300 North Kendall Drive, Suite 400 Prime <br /> Miami, Florida 33156 <br />b. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE <br />C. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE <br />d. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE <br />e. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE <br />f. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE <br /> <br />STANDARD FORM 330 (6/2004) PAGE 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.