My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TLC Engineering
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-01) Prof. Engineering Svcs.
>
Responses
>
TLC Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2010 9:55:22 AM
Creation date
11/18/2010 9:55:10 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Engineering Svcs.
Bid No. (xx-xx-xx)
10-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />{Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Com fete one Section F for each project. <br /> <br />21. TITLE AND LOCATION (City and State) <br />Miami-Dade College <br />Miami, Florida <br /> <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br /> <br />3 <br /> <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (11 applicable) <br />ongoing 2011 (est.) <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER <br />Miami-Dade College Carlos Dougnac 305.237.2852 <br />Colle e Architect <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br />TLC Engineering for Architecture was selected to provide continuing professional <br />engineering services for Miami-Dade College in 2008. In 2010, the contract was <br />extended for 2 more years. Some of the projects performed include the following: <br /> <br />. Continuing Services Contract 2008 - 2010 <br />North Campus - Replacement of 4 existing air handling units located in Building <br />3000 <br />North Campus - Replacement of 2 existing air handling units located in Building <br />5000 <br />Wolfson Campus - Replacement of 1 existing air handling unit located in <br />Building 1000 <br />North Campus - Building 3000 air handling units as-builts <br />Medical Campus - Room 2201 conversion <br />Kendall Campus - Air cooled chiller addition to provide chilled <br />water for backup air-conditioning for office areas located on the <br />first floor of Building L. <br />Kendall Campus - Cooling tower roof waterproofing <br />North Campus - Replacement of air handling unit for the new <br />"Black Box Theater" at Building 5000. <br />Miami-Dade College Culinary Arts Center - LEED Consulting, LEED <br />Registration and Documentation, Energy Modeling and <br />Fundamental Commissioning for a 40,000 sf, 9-story new academic <br />building to be used as the new Culinary Arts Education Facility/Miami, Florida <br /> <br /> <br /> <br />(1) FIRM NAME <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br />a. <br /> <br />Miami, Florida <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />TLC Engineering for Architecture, Inc. <br /> <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />b. <br /> <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />c. <br /> <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />d. <br /> <br />(3) ROLE <br /> <br />Mechanical and Electrical <br />Engineering <br /> <br />(3) ROLE <br /> <br />(3) ROLE <br /> <br />(3) ROLE <br />
The URL can be used to link to this page
Your browser does not support the video tag.