My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Eastern Engineering Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-01) Prof. Engineering Svcs.
>
Responses
>
Eastern Engineering Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2010 11:36:44 AM
Creation date
11/18/2010 11:36:33 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Engineering Svcs.
Bid No. (xx-xx-xx)
10-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />21. TITLE AND LOCATION (City and State) <br /> <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br /> <br />9 <br /> <br />DMA Chiller Replacement <br /> <br />Miami, FL <br /> <br />22, YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> <br />2010 <br /> <br />2010 <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />a. PROJECT OWNER b. POINT OF CONTACT NAME <br />Department of Military Affairs Daphne I, Gurri, LEED AP <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />(786) 265-8655 <br /> <br />Structural design of a galvanized frame to support a new chiller, weighing <br />approximately 6500 Lbs, The new Chiller was situated on an existing roof and <br />therefore the existing steel joists and girders were revised for the new acting <br />loads. Eastern Engineering Group prepared structural specifications for the <br />project, as well as carried out all necessary field visits and the construction <br />administration process for the structural engineering portion of the project. <br /> <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br /> (1) FIRM NAME (2) FIRM LOCATION (Cfty and State) (3) ROLE <br />a, Eastern Engineering Group Miami, FL Structural Engineer <br /> (1) FIRM NAME (2) FIRM LOCATION (Cfty and State) (3) ROLE <br />b. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />C, <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />d, <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />e, <br /> (1) FIRM NAME (2) FIRM LOCATION (Cfty and State) (3) ROLE <br />t, <br /> <br />STANDARD FORM 330 (612004) PAGE 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.