<br />12, NAME
<br />
<br />E, RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />13. ROLE IN THIS CONTRACT
<br />
<br />Gonzalo A. Paz, P,E,
<br />
<br />Structural/Civil Engineer
<br />
<br />14, YEARS EXPERIENCE
<br />a. TOTA~O lb. WITH C3URRENT FIRM
<br />
<br />15. FIRM NAME AND LOCATION ICity and State)
<br />Eastern Engineering Group Miami, FL
<br />16, EDUCATION (DEGREE AND SPECIALlZA nON)
<br />Bachelor of Science Degree in Civil
<br />
<br />17. CURRENT PROFESSIONAL REGISTRATION 1ST A TE AND DISCIPLINE)
<br />
<br />Engineering FL 60734 Structural
<br />
<br />18, OTHER PROFESSIONAL QUALIFICATIONS IPublications, Organizations, Training, Awards, etc.)
<br />
<br />19. RELEVANT PROJECTS
<br />
<br /> (1) TITLE AND LOCATION ICity and State) (21 YEAR COMPLETED
<br /> New World Symphony Campus Expansion Miami Beach, FL PROFESSIONAL SERVICES ICONSTRUCTION IIf applicable)
<br /> 2009 2010
<br /> (31 BRIEF DESCRIPTION IBrief scope, size, cost, erc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br />a,
<br /> Structural design of a mechanical platform for an air handler unit elevated 60 feet
<br /> above finished floor, steel plates for rigging holes, steel frame for exterior rolling
<br /> doors, steel brackets and shelves and steel framing for interior doors, (Structural
<br /> Engineer)
<br /> 111 TITLE AND LOCATION ICity and State) (2) YEAR COMPLETED
<br /> 1111 Lincoln Road Miami Beach, FL PROFESSIONAL SERVICES ICONSTRUCTION IIf applicable)
<br /> 2009 2010
<br /> (3) BRIEF DESCRIPTION IBrief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br />b,
<br /> Design of shop drawings and specifications of aluminum windows, doors, railings and
<br /> gates for this mixed-use building, Also: preparation of shop drawings and docxuments and
<br /> Muck-Up calculations for Test and One-Time Approval preocesses at BCCO, (Structural
<br /> Engineer)
<br /> (1) TITLE AND LOCA liON ICity and State) (2) YEAR COMPLETED
<br /> St, Regis Bal Harbour Bal Harbour, FL PROFESSIONAL SERVICES ICONSTRUCTION IIf applicable)
<br /> 2008 2009
<br /> (3) BRIEF DESCRIPTION IBrief scope, size, cosr, erc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br />c,
<br /> Structural design and shop drawings of windows and doors of three 27-story residential towers.
<br /> Also: structural design of sliding door system, glass railings and louvers; custom design for
<br /> structural connections in particular field conditions and preparation of documents and Mock-Up
<br /> calculations for Tests and One-Time Approval preocesses at BCCO, (Structural Engineer)
<br /> (1 ) TITLE AND LOCATION ICity and State) (2) YEAR COMPLETED
<br /> Martin Luther King Elem, School Miami, FL PROFESSIONAL SERVICES [CONSTRUCTION IIf applicable)
<br /> PE Shelter 2007 2008
<br /> (3) BRIEF DESCRIPTION IBrief scope, size, cost, erc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br />d.
<br /> Structural design of Physical Education Shelter of 2,000 sq ft, consisting of an open
<br /> structure with steel columns. gable roof. spread footings, slab on grade and glulam
<br /> beams under wood planks. Also: construction administration, (Structural Engineer)
<br /> (1) TITLE AND LOCATION ICiry and State) (2) YEAR COMPLETED
<br /> North Dade Maintenance Facility Miami, FL PROFESSIONAL SERVICES ICONSTRUCTION IIf applicable)
<br /> (Phase III) 2006 2008
<br /> (3) BRIEF DESCRIPTION IBrief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br />e,
<br /> This project consisted of a full site development in an eight-acre parcel, Structural
<br /> design of a 12,000 sq ft eight-bay truck maintenance garage; 8,000 sq ft warehouse;
<br /> miscellaneous outbuilding structures; truck wash facility and auto/truck parking,
<br /> (Structural Engineer)
<br />
<br />STANDARD FORM 330 (6/2004) PAGE 2
<br />
|