Laserfiche WebLink
<br />. <br /> <br />Statement of Experience: <br /> <br />Lakdas Y ohalem Engineering (L. Y.E.) technical staff Inspectors has qualifications of <br />Professional Engineers, Certified General Contractors and Threshold Inspectors. <br /> <br />At L. Y.E. we not only a provide Threshold Inspections, we also perform Structural <br />Engineering Design services for similar public projects for the last 39 years In <br />South Florida. <br /> <br />Since L. r.E. primarily practices in Structural Engineering and Threshold Inspection <br />services, our staff has an in-depth knowledge of the design intent, details material <br />and construction specification. <br /> <br />Current Work Load: <br /> <br />Due to the current economy, L. Y.E. work load has been reduced to 75% of its <br />Capacity. Terminal I 8 Cruise Terminal at Port Everglades project is expected to end <br />as of July 2009. <br /> <br />We have a Senior Inspector and project engineer readily available to come on board <br />to take care of this project. <br /> <br />Evidence of Required License. Insurance: <br /> <br />Please see the enclosed copies of: <br /> <br />· L. Y.E 's Professional Engineering License <br />· Insurance Certificate <br /> <br />Financial Capacity: <br /> <br />Our Firm has cash reserve for 5 months of operation and recently completed work <br />revenue will carry the firm for an additional 4 months. Also current work load will <br />carry the firm for an additional 4 months. A total of 13 months. <br /> <br />. <br /> <br />. ~... <br />.. II <br />