My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GLE Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-07-01) Prof. General Engineering
>
Responses
>
GLE Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2010 4:20:53 PM
Creation date
11/19/2010 4:20:37 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. General Engineering Consultant
Bid No. (xx-xx-xx)
07-07-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />FJ"t Overview <br /> <br />I <br /> <br />. Phasc (I Environmcntal Sitc Assessmcnts <br /> <br />I <br /> <br />Should a rccognizcd cnvironmental condition (REe) bc identificd, GLE will prcparc a scopc of work to addrcss thc <br />potcntial for soil & groundwatcr impacts, implcmcnt the scope, and prcparc a Phasc II ESA rcport in accordancc with <br />ASTM E-1903-97 standards which will includc many ofthc following scrviccs: <br /> <br />I <br /> <br />I <br /> <br />. Dcvclopmcnt oftcsting programs <br />. Sitc cxplorations using soil borings (DPT) <br />. Excavation of tcst pits <br />. Collcction and sampling soil, surfacc watcr and groundwatcr <br />. Installation of groundwatcr monitoring wclls <br />. Sampling and idcntification of potcntially hazardous wastc <br />. Sampling of liquid and scdimcnt in strcams, ditchcs, ponds and surfacc runoff <br />. Sampling suspcct arcas of past spills <br />. Soil vapor surveys and monitoring <br />. Gcophysical invcstigations <br />. Analysis of groundwatcr flow and contaminant transport <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />Each Phasc II ESA is uniquc and dcvclopcd spccifically to addrcss thc REC, bascd upon thc rcsults ofthc Phasc I ESA <br />and thc site-spccific invcstigation constraints (utilitics locations, building locations, ctc.). Oncc thc Phasc II ESA is <br />complctcd, GLE will dctcrminc if the sitc rcquircs furthcr invcstigation or ifthcrc is no basis for furthcr invcstigation or <br />remedial action. <br /> <br />I <br /> <br />. Asscssment/Remcdiation Scrviccs <br /> <br />I <br /> <br />GLE's officcs arc staffcd with profcssional engincers, geologists and senior scicntists, who have considerablc cxpcricncc <br />in thc asscssmcnt of property impacts (c.g. pctrolcum, solvcnts), idcntification, cvaluation and sclcction of rcmcdiation <br />trcatment tcchnologies (e.g. Excavation, air-spargc/soil vapor cxtraction (AS/SYE), Dual-Phasc Extraction (DPE), <br />Multi-phasc Extraction (MPE), land fanning, soil washing and/or Biorcmcdiation) for c1canup of a facility. GLE can <br />providc thc following cnvironmcntul cleanup scrviccs: <br /> <br />I <br /> <br />I <br /> <br />mGlE <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.