Laserfiche WebLink
<br />. <br /> <br />--' <br /><{ <br />If) <br />o <br />"'- <br />o <br />"" <br />"'- <br />If) <br />I <br />f- <br />"'- <br />o <br />UJ <br />" <br /><{ <br />"'- <br />~ <br />f- <br />>= <br />UJ <br />I <br />f- <br />Z <br />o <br />Z <br />o <br />>= <br />u <br />a:: <br />f- <br />If) <br />UJ <br />"" <br />UJ <br />I <br />f- <br />o <br />f- <br /> <br />.i <br />If) <br />'!l <br />f- <br />UJ <br />UJ <br />I <br />If) <br />If) <br />I <br />f- <br />Z <br />o <br />o <br />UJ <br />z <br />4' <br />f- <br />Z <br />o <br />u <br /><{ <br />f- <br /><{ <br />o <br />"'- <br />o <br />UJ <br />"" <br />::::> <br />If) <br />o <br />-' <br />u <br />If) <br />Ci <br />"" <br />o <br />UJ <br />If) <br />::::> <br /> <br />. <br /> <br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES <br /> <br />Lead Civil/Structural Engineer, Ravenswood <br />Cogeneration Facility, KeySpan Energy, Long <br />Island City, Queens NY, 01/2001- 11/2003. The <br />Ra\'enswood Cogeneration racility il1\'oh-es the <br />Construction of a new 250 M\V combined cycle plant. <br />The major equipment includes a HRSC, and Steam <br />Turbine Generator, a Combustion Turbine Generator <br />and an Air Cooled Condenser. The project involves the <br />design of a Powerhouse Building with the Air Cooled <br />Condenser on the roof, a \'\!ater Treatment Building, a <br />Gas Compressor Building, new roads and numerous <br />\'ard structures. <br /> <br />A wards/ Client Commendations: <br /> <br />This plant was written up in Power magazine as one of <br />the best new plants built in 2003. <br /> <br />Lead Civil/Structural Engineer, VX Full Scale <br />Plant, U.S. Army Program Manager for Chemical <br />Demilitarization, Newport, Indiana, 03/1997 - <br />01/2001. This project il1\'oh-es the design of the <br />facilities and structures to house the equipment required <br />for the N e\vport Chemical Agent Disposal Facility used <br />for processing \rx (sarin gas) at Newport [\rmy Depot, <br />N C\Vport, TN. The project entails the design of new <br />roads, fencing, drainage, eight ne\v buildings, and <br />numerous outside concrete equipment and tank <br />foundations. t\[r. Singer's responsibilities also included <br />interfacing with the Systems Contractor during the final <br />design and construction phase. <br /> <br />Lead Civil/Structural Engineer, HD Full Scale <br />Plant, U.S. Army Program Manager for Chemical <br />Demilitarization, Aberdeen, MD, 04/1995 - 02/1997. <br />This project il1\'olves the design of the facilities and <br />structures to house the eCluipment requi.red for the <br />Aberdeen Chemical Agent Disposal Facility used for <br />processing I-ID (mustard gas) at Aberdeen Proving <br />Grounds. The project entailed the design of new roads, <br />fencing, drainage, ele\'en ne\v buildings, and numerous <br />outside concrete equipment and tank foundations. Mr. <br />Singer's responsibilities also included interfacing with the <br />Systems Contractor during the final design and <br />cons truction phase. <br /> <br />Senior Structural Engineer, Building Inspection, <br />Confidential Client, Los Angeles, CA 02/1994 - <br />03/1995. <br /> <br />I SHAW ENVIRONMENTAL, INC. <br /> <br />OGC 122006T <br /> <br />Lead Structural Engineer, Coal Compliance Project, <br />New England Power Service Company, Somerset, <br />MA, 10/1944 - 03/1995. <br /> <br />Senior Structural Engineer, Structural Engineering <br />Support, Tampa Electric Company, Tampa, FL, <br />08/1992 - 01/1994. <br /> <br />Lead Civil/Structural Engineer, Capital <br />Appropriation Report - Greenfield Mill, Scott Paper <br />Corp., Newman, KT, 01/1991- 10/1991. <br /> <br />Lead Civil/Structural Engineer, Miscellaneous Pulp <br />and Paper Mill Projects, Georgia Pacific <br />Corporation, Plattsburgh, NY, 04/1987 - 08/1991. <br /> <br />Lead Civil/Structural Engineer, Mill Expansion, <br />Confidential Client, Chesapeake, VA, 05/1990 - <br />04/1991. <br /> <br />Lead Civil/Structural Engineer, No.1 Tissue <br />Machine Rebuild, Kimberly-Clark Corp., New <br />Milford, CT, 05/1988 - 11/1989. <br /> <br />Lead Civil/Structural Engineer, Paper Machine and <br />Reel Storage System, Champion International <br />Corp., Deferiet, NY, 12/1988 - 06/1989. <br /> <br />Lead Civil/Structural Engineer, Pulp Mill <br />Expansion, Georgia-Pacific Corp., Plattsburgh, NY, <br />04/1988 - 08/1988. <br /> <br />Lead Civil/Structural Engineer, Stock Preparation <br />System, Mohawk Paper Co., Waterford NY, 01/1987 <br />- 04/1987. <br /> <br />Lead Civil/Structural Engineer, No.3 Paper <br />Machine Rebuild, Little Rapids Corp., Potsdam, <br />NY, 05/1986 - 11/1986. <br /> <br />Lead Civil/Structural Engineer, Cauticizing <br />Building, James River Corp., Berlin, NH, 05/1986 - <br />10/1986. <br /> <br />Lead Civil/Structural Engineer, New Foundations <br />(No.1 Paper Machine) and Renovations (No.2 <br />Paper Machine), Mohawk Paper Company, <br />Waterford, NY, 06/1986 - 08/1986. <br /> <br />West Springfield, MA, 03/1986 - 06/1986 <br /> <br />BARRY SINGER 0 <br />