|
<br />.
<br />
<br />.J
<br /><(
<br />U)
<br />o
<br />Q.
<br />o
<br />'"
<br />Q.
<br />U)
<br />I
<br />>-
<br />U-
<br />o
<br />w
<br />to
<br /><(
<br />Q.
<br />W
<br />-'
<br />>-
<br />;::
<br />w
<br />I
<br />>-
<br />Z
<br />o
<br />Z
<br />o
<br />;::
<br />u
<br />ii:
<br />>-
<br />U)
<br />W
<br />'"
<br />W
<br />I
<br />>-
<br />o
<br />>-
<br />.~
<br />U)
<br />'!!
<br />>-
<br />w
<br />W
<br />I
<br />U)
<br />U)
<br />I
<br />>-
<br />z
<br />o
<br />o
<br />w
<br />Z
<br />;;:
<br />>-
<br />z
<br />o
<br />u
<br /><(
<br />>-
<br /><(
<br />o
<br />U-
<br />o
<br />w
<br />'"
<br />::::>
<br />U)
<br />g
<br />u
<br />U)
<br />o
<br />'"
<br />o
<br />w
<br />U)
<br />::::>
<br />
<br />.
<br />
<br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
<br />
<br />calculate the axial and horizontal spring constants and
<br />damping ratios for use in the dynamic analyses of the
<br />Gas Turbine/ Generator.
<br />
<br />Geotechnical Consultant, Marcus Hook
<br />Cogeneration Plant, PG&E National Energy Group,
<br />Marcus Hook, PA, 03/2001- 04/2002. i\S
<br />Geotechnical Consultant, performcd adequacy review
<br />for stability analysis of the perimeter slope at the site of
<br />combined cycle power plant and reviewcd the shear
<br />strength parameters used for the stability analysis.
<br />Pro\'ide the method for slope stability analysis using thc
<br />anchor piles to stabilizing thc slopc with marginal factor
<br />of safcty.
<br />
<br />Geotechnical Consultant, Private Fuel Storage
<br />Facility - Skull Valley, UT, Private Fuel Storage,
<br />L.L.c., Skull Valley, UT, 04/1998 - 04/2002. As
<br />Geotechnical Consultant, performed technical review for
<br />\'arious methods of site investigation, formulatcd static
<br />and dynamic laboratory soil tcsting program, intcq1retcd
<br />soil strength and compressibility paramctcrs for bcaring
<br />capacity and settlcmcnt calculations. Pnn'ided technical
<br />input and re\.iew for thc responscs to NRC and Statc of
<br />Utah inquiry questions generated for prc-public hearing
<br />of the licensing of the facility. Pcrformed tcchnical
<br />rc\'iews of the geotechnical design criteria and soil
<br />structurc interaction calculations.
<br />
<br />Geotechnical Consultant, Canneleton Locks and
<br />Dam, PG&E National Energy Group, IN, 03/2001-
<br />06/2001. As Geotechnical Consultant, provided
<br />independent review of the existing rock and soil
<br />laboratory testing data to assess thc shcar strcngth
<br />properties used for the dam foundation. The shcar
<br />strength information was used to e\'aluate the stability of
<br />the concrete gravity structure that incorporatcd a
<br />proposed hydroelectric generating unit.
<br />
<br />Geotechnical Consultant, FERC safety-Related
<br />Work, Tapoco and Yadkin Projects - PB Power,
<br />NC, 03/2000 - 06/2001. As Geotechnical Consultant,
<br />provide geotechnical engineering services to PB Power
<br />for FERC safety-related works at Santeetlah and Cheoah
<br />dams. As part of the work, revicwed stability
<br />calculations and responses to FERC on the Santeehlah
<br />Six Periodic Inspection Report regarding shcar strcngth
<br />of the concrete to rock contact. Provided review for the
<br />
<br />SHAW ENVIRONMENTAL, INC.
<br />
<br />06C122006T
<br />
<br />calculation to ree\'aluate the stability of rock \vedges at
<br />Cheaoh of the co dam for revised flood conditions in
<br />response to FERC comments on the Six Periodic
<br />Inspection Report.
<br />
<br />Geotechnical Consultant, The Independent Spent
<br />Fuel Storage Installation, Maine Yankee Atomic
<br />Power Company, Wiscasset, ME, 01/1999 - 06/2001.
<br />As Gcotechnical Consultant, performed adequacy review
<br />for site investigation, formulated laboratory soil testing
<br />program, interpreted soil strength and compressibility
<br />parameters for bearing capacity and scttlemcnt
<br />calculations. Performed technical rc\'icws of bearing
<br />capacity and scttlement calculations, gcotechnical
<br />investigation report and geotechnical design criteria.
<br />
<br />Geotechnical Consultant, Rail Spur - Big Brown
<br />Steam Electric Station, TXU Electric, Fairfie[d, TX,
<br />03/1997 -10/2000. As Gcotechnical Consultant,
<br />pro\'ided technical input and revie\v for the design of
<br />soil nailing walls, test pile program, soillatcralmovcmcnt
<br />and pile response due to coal pile surcharge, tubular
<br />gabions, slope protection design, earth pressurcs of
<br />rctaining structurcs and underdrain design for
<br />construction of the 23 mile rail spur and associated
<br />facilities.
<br />
<br />Geotechnical Consultant, Chilhowee Dam
<br />Subsidence Investigation, Tapoco, Inc., TN,
<br />03/2000 - 06/2000. As Geotechnical Consultant,
<br />pro\'ided input to conduct a field il1\'estigation on the
<br />left abutment embankment section after a local area of
<br />subsidence was reportcd. Borings werc conductcd to
<br />dctcrminc any matcrial deformation. A report was
<br />prcpared for FERC regarding the finding.
<br />
<br />Geotechnical Consultant, Mystic Station Betterment
<br />Project, Sithe Mystic Development L.L.c., Everett,
<br />MA, 03/1999 - 06/2000. i\S Gcotechnical Consultant,
<br />provided pile foundation design for supporting the
<br />wastewater tanks, firc pumphouse, water tanks and pipe
<br />supports. Performed technical reviews for the pile
<br />installation spccification and geotechnical design critcria
<br />for the bettermcnt facilities.
<br />
<br />THOMAS Y. CHANG 4
<br />
|