Laserfiche WebLink
<br />. <br /> <br />...i <br /><{ <br />(f) <br />o <br />0- <br />o <br />0: <br />0- <br />(f) <br />I <br />>- <br />u. <br />o <br />w <br />'" <br /><{ <br />0- <br />~ <br />>- <br />>= <br />W <br />I <br />>- <br />Z <br />o <br />Z <br />o <br />>= <br />u <br />a: <br />>- <br />(f) <br />W <br />0: <br />W <br />I <br />>- <br />o <br />>- <br /> <br />.~ <br /> <br />(f) <br />~ <br />>- <br />W <br />W <br />I <br />(f) <br />(f) <br />I <br />>- <br />z <br />o <br />o <br />w <br />z <br />;;: <br />>- <br />z <br />o <br />u <br /><{ <br />>- <br /><{ <br />o <br />u. <br />o <br />W <br />0: <br />::> <br />(f) <br />o <br />-' <br />u <br />(f) <br />is <br />0: <br />o <br />W <br />(f) <br />::> <br /> <br />. <br /> <br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES <br /> <br />environmental permits, regulatory requirements and <br />mitigation commitments. <br /> <br />t\fanaged the preparation of all projcct technical <br />rcsponscs and tracks any corrective actions rcquircd to <br />comply with the technical consultants. Coordinated and <br />re\'iewed environmental studies and reports managed the <br />preparation of Environmental Impact Reports; projcct <br />change notices and other permitting documentation <br />required for environmentally-sensitive facility <br />components. Responsible for project status and <br />compliance reporting for cnvironmental and mitigation <br />non-compliance issues, and Regulatory Compliance <br />Department goals and objectives. <br /> <br />Lead Environmental Engineer, Interim Power <br />Supply, K Street Substation to Deer Island, Boston <br />Edison Company, Boston, MA, 10/1988 - 09/1990. <br />i\S Lead Environmcntal Scientist, responsible for <br />identifying and scheduling permitting requirements, <br />identifying cll\.ironmental constraints and managing the <br />preparation of permitting and licensing documentation <br />associated with the installation of a liS kV submarine <br />cable from K Street in South Boston, across Boston <br />Harbor to Deer Island for the construction and <br />operation of new secondary treatment facilities. <br />Prepared Scope of \\'ork and reviewed bids for sampling <br />and analysis of sediment and water quality during <br />construction. Prepared set of permit applications for <br />emergenc~' repair of the cable <br /> <br />SHAW ENVIRONMENTAL, INC. <br /> <br />EILEEN M. LONDON <br /> <br />4 <br /> <br />06C122006T <br />