My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Zyscovich
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-08-01) Prof. Design Svcs. for Heritage Park and Parking Garage
>
Responses
>
Zyscovich
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2010 12:27:59 PM
Creation date
11/29/2010 11:33:01 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Design Svcs for Heritage Pk
Bid No. (xx-xx-xx)
07-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />. (Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />21. TITLE AND LOCATION (City and State) <br />Riverbend Park, Palm Beach County, FL <br /> <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br /> <br />4 <br /> <br />PROFESSIONAL SERVICES <br />2005 <br /> <br />22. YEAR COMPLETED <br /> <br />CONSTRUCTION (If applicable) <br />2006 <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />a. PROJECT OWNER b. POINT OF CONTACT NAME <br />Palm Beach Count Mr. Lar Noe el, P.E. <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (include scope, size, and cost) <br /> <br />C. POINT OF CONTACT TELEPHONE NUMBER <br />561 233-0208 <br /> <br />Tierra was responsible for providing geotechnical services for the design of three (3) pedestrian bridges in the Riverbend Park in Palm <br />Beach County, Florida. The project included the bridge over Loxahatchee River and also access road for the park. Field study included a <br />Standard Penetration Test (SPT) borings to a depth of 50 feet below the existing grade for the proposed bridges. Tierra also periormed <br />material testing and pile inspection during construction. This project was completed on-time and within budget. <br /> <br />. <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />a. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />b. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />C. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />d. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />e. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />f. <br /> STANDARD FORM 330 (6/2004) <br />
The URL can be used to link to this page
Your browser does not support the video tag.