Laserfiche WebLink
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />12. NAME <br />Jerry Ingram, P.E. <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />Com lete one Section E for each ke <br />13. ROLE IN THIS CONTRACT <br />Principal-in-Charge <br /> <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRM <br />40 29 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />Kimley-Horn and Associates. Inc., West Palm Beach, FL <br /> <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />Bachelor of Science / Civil Engineering <br />Master of Science / Transportation Engineering <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) <br />FL / P.E. <br />CA / P.E. <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training. Awards. etc.) <br />Thirty-three years of transportation engineering experience; served as principal-in-charge and/or quality control advisor on a range <br />of traffic engineering and traffic control system projects, including many of the most innovative systems in the U.S. <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SW Capital Circle PD&E Study PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Tallahassee,FL <br /> (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br />a. <br /> Principal-in-charge of the Kimley-Horn team performing a PD&E study for Capital Circle Southwest from Blountstown Highway to Crawfordville Highway. The goal <br /> of the project is to ensure that the transportation improvements also incorporate regional stormwater solutions. incorporate greenways, protect and enhance the <br /> natural environment. include aesthetic enhancements, and seek opportunities to include recreation improvements. Services include data collection. traffic analysis, <br /> and meetings with local. state, and federal reviewers. Public involvement services involve working with a wide cross-section of community stakeholders and <br /> technical experts, and creation of multiple newsletters discussing project elements. Cost: $2.7 million. <br /> (1) TITLE AND LOCATION (City and Stale) (2) YEAR COMPLETED <br /> SunPass Challenge Projects PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Florida's Turnpike Enterprise 2003 <br />b. (3) BRIEF DESCRIPTION (Briefscope. SIZe, cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Served as principal-in-charge for this fast-track contract that includes retrofitting toll plazas on the Turnpike's southern system in Miami-Dade, Broward, and Palm <br /> Beach counties. Our services include preparing contract plans and specifications. Cost: TBD. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Turnpike Mainline Widening from North of Sunrise Blvd. to Atlantic PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Blvd. 2004 <br /> Broward County, FL <br />c. (3) BRIEF DESCRIPTION (Brief scope, size, cosl. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Principal-in-charge for combined PD&E and design project widening 6.5 miles of Florida's Turnpike Mainline from six lanes to eight lanes. The project includes <br /> major reconstruction of the Turnpike interchange at Commercial Boulevard. Project also includes widening of three existing Turnpike mainline bridges and <br /> reconstruction of two bridges over the Cypress Creek mainline toll plaza. Cost: $82 million. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Turnpike Widening from HEFT to Johnson Street PD&E Study and PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Design <br /> Broward County, FL <br />d. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Principal-in-charge for the Kimley-Horn team performing simultaneous PD&E and design services to widen Florida's Turnpike Mainline from Homestead Extension <br /> of Florida's Turnpike (HEFT) to just north of Johnson Street in Broward County. Cost: $7.9 million. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Turnpike Mainline Widening from Lake Worth to Jupiter, PD&E PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Study and Design <br /> Palm Beach County, FL <br />e. (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Principal-in-charge for the PD&E study to consider the widening of more than 22 miles of the Turnpike in Palm Beach County. Cost: $1,271,545. <br />