My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kimley-Horn & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-08-01) Prof. Design Svcs. for Heritage Park and Parking Garage
>
Responses
>
Kimley-Horn & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2010 3:35:10 PM
Creation date
11/29/2010 3:34:34 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Design Svcs. for Heritage Pk
Bid No. (xx-xx-xx)
07-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />'. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />12. NAME <br />Jonathan Haigh, RLA, ASLA <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />Com lete one Section E for each ke <br />13. ROLE IN THIS CONTRACT <br />Park Planning <br /> <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL b, WITH CURRENT FIRM <br />12 3 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />Kimley-Horn and Associates, Inc., West Palm Beach, FL <br /> <br />16. EDUCATION (DEGREE AND SPECIALlZA T/ON) <br />Bachelor of Landscape Architecture <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />FL/L.A. <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizalions. Traming. Awards. etc) <br />Experienced project manager with nearly twelve years of landscape architectural experience. Specific design expertise in <br />greenways and trails, active and passive parks, and parks master planning. <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Wilson Community Center, Pool, and Park Complex PROFESSIONAL SERVICES CONSTRUCTION (tf Applicable) <br /> Boynton Beach, FL 2006 <br />a. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Landscape architect for the Kimley-Horn team that served in the preparation of construction documents for Wilson Center. Pool, and Park Complex in Boynton <br /> Beach. Improvements include upgrades to the existing aquatic facility, a new 12,000 sq. ft. community recreation center, two new outdoor basketball courts, a new <br /> playground area with a tot lot and restroom facilities, an open multi-purpose grassed play field as well as parking, drainage. and utilities. Cost: $4.8 million. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Tampa General Hospital Expansion PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Tampa, FL 2005 <br />b. (3) BRIEF DESCRIPTION (Brief scope. size. cost, etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Lead landscape architect providing construction drawing and detail design services for a linear park along the Seddon Channel in downtown Tampa. The project <br /> consists of a concrete paver walkway with a series of tensile fabric shade structures, a modern fire lane turnaroundlpublic park space, a plan for a decorative rock <br /> installation under a new parking structure, and several other common area hardscape and landscape features. This project will clean up the hospital's "face" to the <br /> public channel side view. This park part of Marjorie Park. Cost: $20.000. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Sugar Sand Park Carousel PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Boca Raton, FL 2005 <br />c. (3) BRIEF DESCRIPTION (Brief scope. size. cost, etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Landscape architect for the Kimley-Horn team responsible for the development of Phase IV of Sugar Sand Park, including site planning. environmental permitting, <br /> civil. landscape, and architectural design. The first design package was for civil, electrical, landscape. and hardscape improvements for installation of a carousel. <br /> Cost: $1.1 million. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Seaview Tennis Center PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Palm Beach, FL <br />d. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Landscape architect for the redevelopment of this tennis facility in the Town of Palm Beach. Project includes converting eight existing courts to clay with <br /> subterranean irrigation systems as well as the design of new fencing. lighting, and additional storage facilities. Cost: $1.3 million. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> IslandWalk at the West Villages PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> North Port, FL <br />e. (3) BRIEF DESCRIPTION (Brief scope. size. cost, etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Lead landscape architect providing landscape design services for entry features, perimeter buffers. residential units, lakeside plantings, and street tree plantings. <br /> This project incorporates multiple phases of construction drawings. Cost: $2.5 (contract value to date). <br />
The URL can be used to link to this page
Your browser does not support the video tag.