My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kimley-Horn & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-08-01) Prof. Design Svcs. for Heritage Park and Parking Garage
>
Responses
>
Kimley-Horn & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2010 3:35:10 PM
Creation date
11/29/2010 3:34:34 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Design Svcs. for Heritage Pk
Bid No. (xx-xx-xx)
07-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />,. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />-I <br /> <br />12. NAME <br />Fadi Khalil, P.E. <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />Com lete one Section E for each ke <br />13. ROLE IN THIS CONTRACT <br />Civil Engineering <br /> <br /> <br />14. YEARS EXPERIENCE <br />a, TOTAL b, WITH CURRENT FIRM <br />8 0 <br /> <br />15. FIRM NAME AND LOCATION (City and Slale) <br />Kimley-Horn and Associates, Inc., Miami Beach, FL <br /> <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />Master of Science I Civil Engineering <br />Bachelor of Science I Civil Engineering <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Mil P.E. <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publicalions. Organizallons. Training. Awards. etc) <br />More than eight years of diverse civil engineering experience with areas of expertise including land development. stormwater <br />management, and utility systems. Proficient in AutoCAD, AutoDesk Land Desktop, AutoDesk Civil Design and design analysis <br />software programs. <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (CUy and Slale) (2) YEAR COMPLETED <br /> Mondrian South Beach PROFESSIONAL SERVICES <br /> Miami Beach, FL 2007 <br />a. (3) BRIEF DESCRIPTION (Bnef scope. size. cosl. etc) AND SPECIFIC ROLE [X] Check if project performed with current firm <br /> Served as an analyst for the renovation of an existing structure. Tasks included redevelopment of pool deck and associated grading. design of a new drainage <br /> systems, and preparation of construction documents. Cost: $134,430. <br /> (1) TITLE AND LOCATION (Cily and Slale) (2) YEAR COMPLETED <br /> Off Brickell PROFESSIONAL SERVICES CONSTRUCTION (If Appl1cable) <br /> Miami, FL 2007 <br />b. (3) BRIEF DESCRIPTION (Brief scope. size. cosl. etc) AND SPECIFIC ROLE [X] Check if project performed with current firm <br /> Project engineer, project consists of a hotel and office building including a parking structure and two stories retail area. currently in the permitting phase. <br /> Responsibilities included due diligence level services during pre-development. Design a storm water system with drainage wells and exfiltration trenches, design of <br /> a new water and sewer systems, paving. grading and offsite road design and permitting. Cost: $242,300. <br /> (1) TITLE AND LOCATION (CUy and State) (2) YEAR COMPLETED <br /> Marriott Hotel PROFESSIONAL SERVICES CONSTRUCTION (If Appl1cable) <br /> Miami, FL <br />c. (3) BRIEF DESCRIPTION (Brief scope. size. cost. elc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br /> Project engineer, project consists of demolishing existing buildings and construct two new buildings with new parking. Responsibilities included due diligence level <br /> services during pre-development. Design a storm water system with exfiltration trenches, Onsite and Offsite water and sewer collection systems. paving. grading <br /> and Drainage; onsite road design and permitting. <br /> (1) TITLE AND LOCATION (CIty and Slale) (2) YEAR COMPLETED <br /> French Landing Park PROFESSIONAL SERVICES CONSTRUCTION (If Appl1cable) <br /> Van Buren Township, MI <br />d. (3) BRIEF DESCRIPTION (Brief scope. size. cost. elc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm <br /> Project manager. This was an existing park with deteriorating facilities and the project consists of adding new bathroom facility with septic fields, new park entrance, <br /> new parking area, new hardscape and landscape areas, new playground area. Responsibilities included coordination and design. Design a septic system. Entrance <br /> design. grading, water distribution system, and prepare bid documents and specifications. <br /> (1) TITLE AND LOCATION (City and Slale) (2) YEAR COMPLETED <br /> Van Buren Park PROFESSIONAL SERVICES CONSTRUCTION (If Appl1cable) <br /> Van Buren Township, MI <br />e. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm <br /> Project manager. Project consisted of developing the old park area by adding new bathroom facilities, paved roads. handicap access to the adjacent lake. new <br /> parking area. new maintenance building, new hardscape and landscape areas, new playground areas. Responsibilities included coordination and design, due <br /> diligence level services during pre-development. Designed a stormwater system with open detention ponds, entrance design, paved roads design, grading. water <br /> and sewer system. and prepare bid documents and specifications. <br />
The URL can be used to link to this page
Your browser does not support the video tag.