Laserfiche WebLink
<br />~Il <br />A.D.A <br />IDI.....I............ DID! ~..I~(.... <br /> <br />12. NAME <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> <br />Com fete one Section EJor each ke <br />13, ROLE IN THIS CONTRACT <br /> <br /> <br />14. YEARS EXPERIENCE <br />B;WITH CURRENT FIRM <br /> <br />Herminia "Chiqui" Larrua, PE <br /> <br />15. FIRM NAME AND LOCATION (City and state) <br />A.D.A. En ineerin , Inc. Miami, Florida <br />16. EDUCATION (Degree and SPecialization) <br />Bachelor of Sciehce - Civil Engineering <br /> <br />A. TOTAL <br />31 <br /> <br />.~enior Civil Engineer <br /> <br />17, CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />Florida - Professional Engineer <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organiz,ations, Training, Awards, etc,) <br /> <br />3 <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Districtwide Drainage & Plans Review Consultant Services - PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Florida Department of Transportation, District 6 (FOOT 06) / Ongoing Ongoing <br /> Miami-Dade County, Florida <br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br /> Ms, Larrua assists the Florida Department of Transportation, District 6, Districtwide Drainage Design & Plans Review <br /> Consultant Services contract in reviewing drainage design plans, drainage reports, assessing roadway flooding <br /> related problems and designing cost -effective improvements to address the flooding problems. Estimated <br /> professional fee $1.5M. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> N.W. 87m Avenue between N.W. 162"0 Street and N.W. 170tn PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Street - MDCPW / Miami, Florida Ongoing Ongoing <br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br /> Ms, Larrua is the Project Manager and lead designer for the improvements to the existing urban area to include 4 <br /> through lanes in addition to exclusive left turn lanes at two major intersections, Street lighting and the design of a <br /> traffic signal at the intersection with 170th Street are also part of the project. Professional fee $87,500. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> West Dixie Highway from N.E. 119m Street to N.E. 156m Street PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> - FOOT 06/ Miami-Dade County, Florida 2005 2006 <br />C. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br /> Ms, Larrua was the Project Manager and roadway designer for this Resurfacing, Restoration and Rehabilitation <br /> (RRR) project which included safety improvements to the urban area in addition to the pavement rehabilitation. This <br /> project included new turning lanes, signal timing, new raised medians, handicapped access and pavement milling <br /> and resurfacing. Estimated professional fee $150,000. Estimated construction cost $800,000, <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> (SR 997) Krome Avenue at (SR 91) S.W. 8tn Street / Miami- PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Dade County, Florida 2001 2002 <br />d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE D Check if project performed with current firm <br /> Ms. Larrua was the Project Manager and roadway lead designer for this roadway reconstruction and bridge <br /> replacement project. The design included a major intersection reconstruction, with major drainage improvements, and <br /> replacement of the bridge over Canal C-3. Estimated professional fee $150,000, Estimated construction cost $1.8M. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> S.W. 122"a Street Roadway Reconstruction from S.W. 40tn PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Street to Coral Way - MDCPW / Miami, Florida 1993 1993 <br />e. <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE D Check if project performed with current firm <br /> As Project Engineer, Ms, Larrua was responsible for upgrading the existing urban facility to include sidewalks, curb <br /> and gutters at both sides of the proposed 4-lane facility and construction of a new drainage system. <br /> <br />STANDARD FORM 330 (6/2004) PAGE 2 <br />