My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LIVS Assoc.#4
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-02) Prof. Architectural Svcs.
>
Responses
>
LIVS Assoc.#4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2010 9:47:15 AM
Creation date
12/1/2010 9:42:53 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Architectural Svcs.
Bid No. (xx-xx-xx)
10-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />12. NAME <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />13. ROLE IN THIS CONTRACT <br /> <br />Project Manager <br /> <br />14 YEARS EXPERIENCE <br />a TOTAL I b WITH CURRENT FIRM <br /> <br />26 I 24 <br /> <br />Lazaro A. Cabezon <br />15. FIRM NAME AND LOCATION ICily and Sidle) <br /> <br />LIVS Associates, Coral Gables, Florida <br /> <br />16. EDUCATION !DEGREE AND SPECIALIZATION! <br /> <br />Bachelor of Arts/ 1991/ Architecture <br /> <br />17. CURRENT PROFESSIONAL REGISTRA TlON ISTA 7E AND DISCIPLINE! <br /> <br />18. OTHER PROFESSIONAL OUALlFICA TIONS (PI/Mcilliuns, OrYilnililliuns, Trainlllg, AWilrds, elc.! <br /> <br />19 . RELEVANT PROJECTS <br /> <br /> 111 TITLE AND LOCATION ICily and S{ale! (2) YEAR COMPLETED <br /> USDA APHIS Miami Facility - Plant PROFESSIONAL SERVICES ICONSTRUCTION Ilf applicable! <br /> Protection and Quarantine (PPQ) , FL 2010 2010 <br /> 131 BRIEF DESCRIPTION IBrief scope. size. cos!, etc.! AND SPECIFIC ROLE U Check if project performed with current firm <br />a. <br /> Project Manager for (PPQ) at Miami International Airport serves as the principal control <br /> point for the import and export of plant material in the southeastern United States. <br /> The 45,000 s.f. facility will consist of inspections areas and laboratories for the <br /> identification of pests and insects. Construction Cost 22M <br /> (11 TITLE AND LOCATION ICIly and Slale! 121 YEAR COMPLETED <br /> New South Animal Care Facility PROFESSIONAL SERVICES I CONSTRUCTION Ilf applicable) <br /> Broward, FL Silver LEED 2011 2011 <br /> (31 BRIEF DESCRIPTION IBrief scope. size, cosl. etc.) AND SPECIFIC ROLE U Check if project performed with current firm <br />b. <br /> Project Manager for a New South Animal Care Facility, LEED Silver. This project will <br /> consist of programming, design and construction management for a 40,000 square feet <br /> Building for Broward County Animal Care & Regulation Division. Construction Cost 10M <br /> (11 TITLE AND LOCATION ICity and State) (21 YEAR COMPLETED <br /> Highland Oaks Middle School, Miami, PROFESSIONAL SERVICES I CONSTRUCTION Ilf applicable) <br /> FL 1999 1999 <br /> (3) BRIEF DESClllPTION IBrief scope. size. cust, elc.! AND SPECIFIC ROLE U Check if project performed With current firm <br />C. <br /> Project Manager to a 18,500 sq ft classroom and laboratory addition and selective <br /> renovation in the existing school. The renovation of the existing school consisted of <br /> upgrades in selective areas and building systems including the Media center Laboratories <br /> and replacement of the fire alarm system. <br /> (1) TITLE AND LOCATION ICily and Stale) 121 YEAR COMPLETED <br /> Broward Community College, Broward, PROFESSIONAL SERVICES ICONSTRUCTION (II applicable) <br /> FL 1999 1999 <br /> (3) BRIEF DESCRIPTION IBrief scope, size. cost, elc.! AND SPECIFIC ROLE U Check if project performed with current firm <br />d. <br /> Project Manager for a four building expansion of the South Campus. The facilities <br /> included additions and renovations to the staff office, career replacement and testing <br /> facilities. a 400 seat auditorium and alterations and renovations to the kitchen and <br /> dining facilities <br /> (11 TITLE AND LOCATION ICily and Stilte) 121 YEAR COMPLETED <br /> Westview Middle School PROFESSIONAL SERVICES ICONSTRUCTION IIf applicable! <br /> Miami, Florida 2003 2003 <br /> (31 BRIEF DESCRIPTION IBllef scope, size, COSI. etc.) AND SPECIFIC ROLE U Check it project performed with curlent firm <br />e. <br /> Project Manager for or a new 25,000 S. f . science wing with 8 classrooms, 4 laboratories <br /> and a library. The project also required the complete renovation LO the existing <br /> 112,000 s.f. school building consisting of classrooms, an auditorium, a cafeteria, <br /> locker rooms and administrative offices. <br /> <br />STANDARD FORM 330 (5/2004) PAGE 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.