My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LIVS Assoc.#4
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-02) Prof. Architectural Svcs.
>
Responses
>
LIVS Assoc.#4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2010 9:47:15 AM
Creation date
12/1/2010 9:42:53 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Architectural Svcs.
Bid No. (xx-xx-xx)
10-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />12 NAME <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />13 ROLE IN THIS CONTRACT <br /> <br />Carlos A. Alvarez P.E. princinal <br />15. FIRM NAME AND LOCATION ICily "fld Slale) <br /> <br />LIVS Associates, Coral Gables, Florida <br /> <br />16. EDUCATION !DEGREE AND SPECIALlZA nON) <br /> <br />Electrical Engineer <br /> <br />14 YEARS EXPERIENCE <br />a. TOTAL III WITH CURRENT FIRM <br /> <br />40 17 <br /> <br />BS / Electrical Engineering / 1969 <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br /> <br />1974 / Professional Engineer / Florida <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publicaliofls, Orgaflizariofls. Trainll/g. Awards, elc.) <br /> <br /> (1) TITLE AND LOCATION ICily and Slale) (2) YEAR COMPLETED <br /> USDA APHIS Miami Facility - Plant PROFESSIONAL SERVICES ICONSTRUCTION III applicable) <br /> Protection and Quarantine (PPQ) , FL 2011 2011 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost. elc.) AND SPECIFIC ROLE U Check if project performed with current firm <br />a, <br /> Electrical Design & constructin Administrator of the USDA (PPQ) at Miami International <br /> Airport serves as the principal control point for the import and export of plant <br /> material in the southeastern United States, The 45,000 s.f. facility will consist of <br /> inspections areas and laboratories for the identification of pests and insects. <br /> (1) TITLE AND LOCATION ICity afld Slale) 121 YEAR COMPLETED <br /> Westview Middle School, Miami, PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) <br /> Florida 2002 2002 <br /> 13) BRIEF DESCRIPTION (Bnef scope, size. CUSI, etc.) AND SPECIFIC ROLE U Check If project performed with current firm <br />b. <br /> Electrical design and construction administrator of the security systems to the Opa <br /> Locka, Homestead, and Tamiami Airports. Also Life Safety Upgrades to the Concourse A <br /> Facility Station and Design to the (GAC) General Aviation Center that includes studies <br /> and investigations of the facilities. <br /> 111 TITLE AND LOCATION (City al/(l Slate) (2) YEAR COMPLETED <br /> USDA-APHIS Veterinary Services PROFESSIONAL SERVICES ICONSTRUCTION (If appl/caiJle) <br /> Facility at MIA - Miami, Florida 2003 2003 <br /> (3) BRIEF DESCRIPTION ISrwl scope, size. cosl. etc.) AND SPECIFIC ROLE U Check if project performed with current firm <br />c. <br /> Electrical Design and Construction Administrator to this 14 million dollar facility <br /> serves as one of only three hubs in the United States for the control of animal import <br /> and export, The 45,000 s,f. facility has capacity for large animals such as horses with <br /> areas specifically dedicated to birds and reptiles. <br /> (1) TITLE AND LOCATION ICily and Slale) (2) YEAR COMPLETED <br /> Miami Jackson High School, PROFESSIONAL SERVICES ICONSTRUCTION IIf applicable! <br /> Miami, Florida 2009 2009 <br /> (3) BRIEF DESCRIPTION (Brief scope, size. cas!. erc.! AND SPECIFIC ROLE U Check if project performed with current firm <br />d. <br /> Complete electrical engineering design for the $55M replacement school. The project <br /> consisted of a new, three story administration and classroom building, new Auditorium, <br /> cafeteria, kitchen and gymnasium building as well as the renovation of the Media Center <br /> and Bank Building. <br /> (1) TITLE AND LOCATION ICily afld Slale) 121 YEAR COMPLETED <br /> Miami Dade Aviation Department PROFESSIONAL SERVICES ICONSTRUCTION (If applicaiJle) <br /> Miami, Florida 2010 2010 <br /> (3) BRIEF DESCRIPTION IB/ief scope, SIZe, COSI. elc.) AND SPECIFIC ROLE U Check if project performed With current firm <br />e. <br /> Design of the security systems to the Opa Locka, Homestead, and Tamiami Airports. Also <br /> Life Safety Upgrades to the Concourse A Facility Station and Design to the (GAC) General <br /> Aviation Center that includes studies and investigations of the facilities. <br /> <br />19. RELEVANT PROJECTS <br /> <br />STANDARD FORM 330 (612004) PAGE 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.