My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Superior Landscaping
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 10-11-01 Landscape Maintenance Services
>
Responses
>
Superior Landscaping
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2012 11:26:13 PM
Creation date
12/21/2010 11:57:57 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Landscape Maintenance Svcs.
Bid No. (xx-xx-xx)
10-11-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOTE: The quantities shown in this Bid Form are estimates only! They may vary significantly from the actual <br />quantities ordered by the City. Payments shall be for the units ordered, placed, and accepted by the City. The <br />Proposers, by signing this Bid Form and Contract, fully acknowledges that he /she will receive no additional <br />compensation (no overhead, no anticipated profits, etc.) other than the proposal unit price of the items times the <br />number of items authorized, ordered, placed, and accepted by the City. <br />ITEM DESCRIPTION ESTIMATED QUANTITY UNIT PROPOSAL <br />TOTAL <br />C. EQUIPMENT <br />C1 <br />One Front End Loader with Backhoe, including an <br />250 Hours <br />Operator <br />Per Hour = <br />C2 <br />One Front End Loader with Backhoe, including an <br />30 Days <br />Y <br />��'©' <br />Operator <br />�Q 1f 06 <br />1 <br />Per Day = <br />X $ o <br />$ <br />C3 <br />One Front End Loader with Backhoe, including an <br />4 Weeks <br />j� �a <br />Operator <br />Per Week = <br />I <br />C4 <br />One Front End Loader with Backhoe, including an <br />1 Month <br />X $ <br />�.`I <br />$ <br />���-C <br />Operator <br />Per Month = <br />X $ <br />$ <br />C5 <br />One 15,000 GVW (or larger) Dump Truck with an <br />Hours <br />100 H <br />��'j <br />� � � <br />Operator <br />q <br />Per Hour = <br />X $ <br />C�1 <br />$ <br />C6 <br />One 15,000 GVW (or larger) Dump Truck with an <br />10 Days <br />Y <br />Operator <br />� g <br />Per Day = <br />� <br />C7 <br />One 15,000 GVW (or larger) Dump Truck with an <br />1 Week <br />�j 4 ��� <br />'i 00 <br />Operator <br />Per Week = <br />X $ <br />$ <br />C8 <br />One 15,000 GVW (or larger) Dump Truck with an <br />1 Month <br />' - " C" <br />Operator <br />Per Month = <br />C9 <br />One Trailer Mounted Water Tank (500 gallon <br />20 Days <br />y <br />X $ <br />{ �� <br />$ <br />minimum) with Pump and Hose Reel <br />Per Day = <br />C10 <br />One Trailer Mounted Water Tank (500 gallon <br />2 W <br />Weeks <br />X <br />i ��00 <br />$ pC� <br />'� <br />minimum) with Pump and Hose Reel <br />Per Week = <br />PAGE 58 OF 105 <br />PROPOSAL N0. <br />
The URL can be used to link to this page
Your browser does not support the video tag.