My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Superior Landscaping
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 10-11-01 Landscape Maintenance Services
>
Responses
>
Superior Landscaping
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2012 11:26:13 PM
Creation date
12/21/2010 11:57:57 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Landscape Maintenance Svcs.
Bid No. (xx-xx-xx)
10-11-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOTE: The quantities shown in this Bid Form are estimates only! They may vary significantly from the actual <br />quantities ordered by the City. Payments shall be for the units ordered, placed, and accepted by the City. The <br />Proposers, by signing this Bid Form and Contract, fully acknowledges that he /she will receive no additional <br />compensation (no overhead, no anticipated profits, etc.) other than the proposal unit price of the items times the <br />number of items authorized, ordered, placed, and accepted by the City. <br />ITEM DESCRIPTION ESTIMATED QUANTITY UNIT PROPOSAL <br />TOTAL <br />D. MATERIALS <br />X <br />D1 <br />Topsoil (70/30 Mix) <br />200 Cubic <br />Delivered and Installed <br />Yards <br />Per Cubic Yard = <br />X $ <br />$ <br />D2 <br />Premium Red or Premium Gold Mulch Delivered <br />2,000 Cubic <br />�% C =1 <br />and Installed <br />Yards <br />Per Cubic Yard = <br />X $ E'-L <br />$ <br />D3 <br />Mulch (Organic Eucalyptus) <br />3" Cubic Yards <br />5 LA <br />Per Cubic Yard = <br />X $ <br />$ <br />D4 <br />#70 Trap Sand <br />Delivered and Installed <br />700 Cubic Yards <br />3P��i�,� <br />Per Cubic Yard = <br />X $ <br />$ <br />D5 <br />Silica Sand for Medjools <br />40 Cubic Yards <br />`� ts- <br />13 <br />' I d� <br />Per Cubic Yard = <br />i <br />X $ <br />$ <br />D6 <br />Atlas 3000 (or equal) Mix <br />Delivered and Installed <br />300 Cubic Yards <br />✓ r L <br />i 3 , a <br />Per Cubic Yard = <br />X $ <br />$ <br />D7 <br />Solid St. Augustine Floratam Sod Delivered and <br />2500 <br />1. <br />L- <br />Installed <br />Square Feet <br />° <br />I 1 oC) <br />Per Square Foot <br />X $ <br />$ <br />D8 <br />Solid St. Augustine Floratam Sod Delivered and <br />5 Pallets of 500 <br />(l , ` � <br />Installed <br />Square Feet <br />�' vo-� <br />Per Pallet = <br />X $ <br />$ <br />D9 <br />Sea Dwarf Paspalum Sod Delivered and Installed <br />5000 Sq Ft <br />�' I �J <br />��Inc <br />Per Square Foot <br />X $ <br />$ <br />D10 <br />Floratam Sod <br />5000 Sq Ft <br />0,3--(0 <br />Per Square Foot <br />PAGE 60 OF 105 <br />PROPOSAL N0. <br />
The URL can be used to link to this page
Your browser does not support the video tag.