Laserfiche WebLink
other buildup on the inside of the'wethose' and PVC pipe). <br />L18.2.4.Accidental damage to system — Follow the monthly procedure and be <br />mindful to always flush the system before and after making <br />repairs. <br />L18.3. Requirements for Conventional Irrigation Systems within project limits: The <br />Contractor is to familiarize himself with the existing irrigations systems and is <br />responsible for the repair of all components to insure a continually efficient <br />irrigation system. This includes the adjustment of the controllers to insure <br />the correct amount of precipitation necessary for viable vegetative growth, <br />always following any South Florida Water Management District drought <br />guidelines. Contractor is to perform monthly wet tests, to verify viability of <br />system, on the last Wednesday of each month. On the first day of each <br />month report to City, in writing, indicating proper operation of each zone, <br />required repairs, additional costs and updated run time per zone. <br />L19. The Contractor, at his /her expense, will be responsible for the proper maintenance, <br />replacement, repair, or retro- fitting of all irrigation components. The wholesale cost of parts <br />only will be borne by the City, with proper documentation and approval by the City. Labor <br />costs will be paid by the City at the contract approved hourly rate. Any necessary repairs, <br />other than routine irrigation head replacement must be approved in writing by the City prior to <br />start of work. <br />L20. Fertilizer and materials shall be delivered in original, unopened, and undamaged containers <br />showing weight, analysis, and name of manufacturer. All fertilizer materials shall be stored in <br />manner to prevent wetting and deterioration. <br />L21. Fertilizer and insect /disease control materials shall be applied at the rates established by <br />accepted horticultural standards, manufacturer's recommendations, and as approved by City. <br />L21.1 Lawn: For control of fire ants, use Award Fire Ant Killer. Follow <br />manufacturer's instructions for applications amounts and rates. <br />L21.1.1. February - Apply granular 20 -0 -20 with Atrazine or approved equal; St. <br />Augustine'Floratam' Sod and 'Argentine' Bahia Sod. <br />L21.1.2. May - Apply liquid 16 -4 -8 with micro - nutrients and Telstar or equal insect <br />control. <br />L21.1.3. September - Apply liquid 16 -4 -8 with micro - nutrients and Telstar or equal <br />insect control. <br />L21.1.4. December - Apply granular 20 -0 -10 with Atrazine. <br />L21.1.5. The Spring thru Fall application rates for lawn areas will vary according to <br />weather and environmental conditions, but typically average 75 granular <br />pounds per 1000 sq. ft. <br />L21.2 Palms (except Phoenix Dactilifera and Phoenix Canariensis Date Palms): <br />L21.2.1. Apply four applications per year (at quarterly intervals) of liquid 16 -4 -8 with <br />micro - nutrients and granular 13 -3 -13 with micro - nutrients. <br />L21.2.2. The time of the applications will coincide with the lawn applications. <br />L21.2.3. The liquid and granular applications will alternate throughout the year (2 <br />applications of liquid and 2 of granular). <br />L21.2.4. Supplemental Manganese Sulfate and Sul- po -mag may be required to correct <br />nutrient deficiency. <br />L21.2.5. OTC (Lethal Yellowing) injections, as required. <br />PAGE 35 OF 105 <br />PROPOSAL NO. <br />