My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ground Keepers
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 10-11-01 Landscape Maintenance Services
>
Responses
>
Ground Keepers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2012 4:44:36 AM
Creation date
12/21/2010 1:19:37 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Landscape Maintenance Svcs.
Bid No. (xx-xx-xx)
10-11-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 6 <br />PROPOSAL RESPONSE SHEET <br />THIS PROPOSAL IS SUBMITTED TO: <br />City of Sunny Isles Beach <br />18070 Collins Avenue <br />Sunny Isles Beach, Florida 33160 <br />Proposal No. 10 -11 -01 For Landscape Maintenance Services <br />The undersigned Proposers proposes and agrees, if this Proposal is accepted, to enter into an agreement with <br />The City of Sunny Isles Beach in the form included in the Contract Documents to perform and furnish all Work <br />as specified or indicated in the Contract Documents for the Contract Price and within the Contract Time <br />indicated in this Proposal and in accordance with the other terms and conditions of the Contract Documents. <br />6.1. The Proposers accepts all of the terms and conditions of the Advertisement or Invitation to Proposal <br />and Instructions to Proposer's, including without limitation those dealing with the disposition of Proposal <br />Security. This Proposal will remain subject to acceptance for 90 days after the day of Proposal opening. The <br />Proposers agrees to sign and submit the Agreement with the Bonds and other documents required by the <br />Proposalding Requirements within ten days after the date of the City's Notice of Award. <br />6.2. In submitting this Proposal, the Proposers represents, as more fully set forth in the Agreement, that: <br />6.2.1. Proposers has examined copies of all the Proposalding Documents and of the following <br />Addenda (receipt of all which is hereby acknowledged.) <br />Addendum No. I Dated: uloilo <br />Addendum No. Dated: <br />11 IUIIQ- <br />Addendum No. Dated: <br />Addendum No. Dated: <br />6.2.2. The Proposers has familiarized himself /herself with the nature and extent of the Contract <br />Documents, Work, site, locality, and all local conditions and Law and Regulations that in any <br />manner may affect cost, progress, performance, or furnishing of the Work. <br />6.2.3. The Proposers has studied carefully all reports and drawings of subsurface conditions and <br />drawings of physical conditions. <br />6.2.4. The Proposers has obtained and carefully studied (or assumes responsibility for obtaining and <br />carefully studying) all such examinations, investigations, explorations, tests and studies (in <br />addition to or to supplement those referred to in (c) above) which pertain to the subsurface or <br />physical conditions at the site or otherwise may affect the cost, progress, performance, or <br />furnishing of the Work at the Contract Price, within the Contract Time and in accordance <br />with the other terms and conditions of the Contract Documents, and no additional <br />examinations, investigations, explorations, tests, reports or similar information or data are or <br />will be required by Proposers for such purposes. <br />6.2.5. Proposers has reviewed and checked all information and data shown or indicated on the <br />Contract Documents with respect to existing Underground Facilities at or continuous to the <br />site and assumes responsibility for the accurate location of said Underground Facilities. No <br />additional examinations, investigations, explorations, tests, report or similar information or <br />data in respect of said Underground Facilities are or will be required by Proposers in order to <br />perform and furnish the Work at the Contract Price, within the Contract Time and in <br />PAGE 44 OF 105 <br />PROPOSAL N0. LiY t� <br />
The URL can be used to link to this page
Your browser does not support the video tag.