My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ground Keepers
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 10-11-01 Landscape Maintenance Services
>
Responses
>
Ground Keepers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2012 4:44:36 AM
Creation date
12/21/2010 1:19:37 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Landscape Maintenance Svcs.
Bid No. (xx-xx-xx)
10-11-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOTE: The quantities shown in this Bid Form are estimates only! They may vary significantly from the actual <br />quantities ordered by the City. Payments shall be for the units ordered, placed, and accepted by the City. The <br />Proposers, by signing this Bid Form and Contract, fully acknowledges that he /she will receive no additional <br />compensation (no overhead, no anticipated profits, etc.) other than the proposal unit price of the items times the <br />number of items authorized, ordered, placed, and accepted by the City. <br />ITEM DESCRIPTION ESTIMATED QUANTITY UNIT PROPOSAL <br />TOTAL <br />D. MATERIALS <br />Topsoil <br />Dl <br />(70/30 Mix) <br />200 Cubic <br />Delivered and Installed <br />Yards <br />Per Cubic Yard = <br />D2 <br />Premium Red or Premium Gold Mulch Delivered <br />2,000 Cubic <br />and Installed <br />Yards <br />1V- <br />Per Cubic Yard = <br />X `� z <br />$ <br />D3 <br />Mulch (Organic Eucalyptus) <br />3" Cubic Yards <br />Per Cubic Yard = <br />#70 Trap Sand <br />X $ <br />4 <br />$ <br />D4 <br />Delivered and Installed <br />700 Cubic Yards <br />, <br />Per Cubic Yard = <br />oxoc( <br />X $ 4" <br />D5 <br />Silica Sand for Medjools <br />40 Cubic Yards <br />�•"' <br />Per Cubic Yard = <br />X $ <br />3��D <br />� <br />D6 <br />Atlas 3000 (or equal) Mix <br />300 Cubic Yards <br />Delivered and Installed <br />Per Cubic Yard = <br />I <br />X $ <br />$ <br />D7 <br />Solid St. Augustine Floratam Sod Delivered and <br />2500 <br />� 1 4 <br />Installed <br />Square Feet <br />Per Square Foot <br />DS <br />Solid St. Augustine Floratam Sod Delivered and <br />Installed <br />5 Pallets of 500 <br />X $ <br />$ <br />Square Feet, <br />Per Pallet = <br />D9 <br />Sea Dwarf Paspalum Sod Delivered Installed <br />X $ <br />3v ( <br />$ <br />and <br />5000 Sq Ft <br />Per Square Foot <br />1 t� <br />D10 <br />Floratam Sod <br />5000 Sq Ft <br />Per Square Foot <br />'1 �VV09- <br />PACE 60 OF 105 <br />PROPOSAL N0. <br />4� <br />APP - to -u - D I <br />
The URL can be used to link to this page
Your browser does not support the video tag.