Laserfiche WebLink
Description of Work <br />EXHIBIT `A' <br />The following are the required (but not limited to) the threshold inspections for the City Hall project: <br />FOUNDATION <br />SHEAR- WALL, GROUND FLOOR <br />COLUMNS, GROUND FLOOR <br />GROUND FLOOR SLAB <br />SECOND & THIRD FLOOR SLAB <br />COLUMNS, 2ND & 3RD FLOORS <br />SHEAR - WALLS, 2ND & 3RD FLOORS <br />FOURTH FLOOR SLAB <br />COLUMNS, 4TH FLOOR <br />SHEAR -WALL 4TH FLOOR <br />FIFTH, SIXTH, SEVEN & EIGHT FLOOR SLAB <br />FIFTH, SIXTH, SEVEN & EIGHT COLUMNS <br />FIFTH, SIXTH, SEVEN & EIGHT SHEAR -WALLS <br />ROOF SLAB <br />ROOF COLUMNS <br />ROOF SHEAR -WALL <br />STAIRS <br />STOREFRONT/ WINDOWS CONNECTIONS <br />PRECAST CONNECTIONS <br />SHORING <br />