My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(01-03-04) Parking Meter Services
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 5:09:53 AM
Creation date
12/28/2010 10:50:05 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Parking Meter
Bid No. (xx-xx-xx)
01-03-04
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT "A" <br />PARKING METER SPECIFICATIONS <br />MFTFRC- <br />SECTION I — GENERAL SPECIFICATIONS FOR METERS <br />This specification is for a new electronic mechanism with handle -free operation. Mechanism <br />must be compatible with existing Duncan model 80 housing (and additional security devices <br />within) without modification. The mechanism must have a minimum of 8K bytes of memory for <br />data storage and should be able to hold data for 45 days without data being overwritten. The <br />mechanism must be the flush fit type — whereas the coin slot face and debit card slot shall not <br />protrude past the outer surface of the meter housing's mechanism compartment. Mechanism <br />shall operate in a temperature range of —20 to +140 degrees Fahrenheit. Mechanism shall <br />function properly under all weather and street conditions encountered in the City to include <br />grime, dust, rain, salt and street vibrations. The electronic component, including the entire <br />circuit board must be weather proof with protective coating or equivalent. <br />SECTION II — PHYSICAL CHARACTERISTICS <br />A. POWER SUPPLY <br />Mechanism must operate on a commercially available power source (preferably 9 Volts). <br />Batteries supplied shall have a minimum shelf life of 3 years. Power source must keep <br />mechanism performing in a normal manner for a minimum of 12 months. Changing of <br />power source shall be performed without the use of tools. Mechanism shall display a <br />symbol to signal a low battery warning to provide the ability to change batteries before <br />mechanism fails to perform properly. Mechanism must retain memory on rate structure <br />and audit information during battery replacement and /or failure. <br />B. TIME AND VIOLATION DISPLAYS <br />1. Front LCD Display <br />Shall be of the Liquid Crystal Display type (LCD), containing at least four, seven <br />segmented (plus the service messages) characters, each of a minimum dimension of '' /z" <br />high by '/4" wide. The two left most characters shall indicate the time remaining in hours <br />and the two right most characters indicating time remaining in minutes. The hour and the <br />minute display shall be separated by a colon ( : ). For example, a mechanism with ten <br />hours and 5 minutes remaining would display 10:05. The mechanism must have a <br />programmable mode to display negative time. The LCD must optionally display "Out of <br />Order" when unit is dysfunctional. The LCD shall have a programmable back light <br />feature, for nighttime visibility. The back light must have a programmable time of day <br />setting. The backlight shall have a programmable duration setting, activated upon <br />coin/card entry and before the coin is released through the chute. All messages appear on <br />Page 8 of 10 <br />Parking Meter Services Bid <br />City of Sunny Isles Beach <br />17070 Collins Avenue, Suite 250 <br />Sunny Isles Beach, Florida 33160 <br />(305) 947 -0606 Phone (305) 949 -3113 Fax <br />
The URL can be used to link to this page
Your browser does not support the video tag.