Laserfiche WebLink
Relevant Project Experience <br />1 <br />7) Project: Miramar Landscape Corridor Guidelines <br />' Client: City of Miramar <br />' Project Description: Landscape Corridor Guidelines consisting of 15 corridors <br />for the City of Miramar exemplifies MLA's strong understanding of the entire <br />landscape architectural procedural process beginning with the defining of the <br />' scope of services through the design process to the eventual final costing and <br />assistance in enacting ordinances to effectuate the proposed design. <br />tIncreased pressures of development on the City of Miramar necessitated <br />Landscape Corridor Guidelines to be established to provide unification and an <br />' overall design theme for the citywide corridors to guide and keep pace with <br />increased growth. Concurrently, the MLA engineering staff completed a <br />master roadway network plan within the City limits which provided a <br />' compliment to the landscape guidelines, as well as, for use in integration into <br />the City's overall GIS database. Working closely with the engineering staff on <br />the development of typical roadway sections, the landscape architectural <br />' design staff provided direction on roadway section designs to allow for <br />optimum landscaping of the corridors, particularly with regard to applying <br />sight distance clear zones and landscaping per FDOT standard indexes 545, <br />' 546 and 700. Utilization of curbing in lieu of open section was also <br />encouraged to optimize landscaping adjacent to the roadways within the <br />designated right -of -way areas. <br />IClient Reference: <br />' Robert Payton, Acting City Manager <br />City of Miramar <br />(954) 967 -1610 <br />t <br />I\\MILEG \VOLI\ Non - Project \Landscaping \Proposals \3869 sunny isles \Relevant Experience.doc <br />