My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Miller Leg
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(01-05-01) Landsc. Architectural Svcs.
>
Miller Leg
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 8:33:34 AM
Creation date
12/29/2010 1:49:28 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Landscape Architect Svcs.
Bid No. (xx-xx-xx)
01-05-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Relevant Project Experience <br />1 <br />7) Project: Miramar Landscape Corridor Guidelines <br />' Client: City of Miramar <br />' Project Description: Landscape Corridor Guidelines consisting of 15 corridors <br />for the City of Miramar exemplifies MLA's strong understanding of the entire <br />landscape architectural procedural process beginning with the defining of the <br />' scope of services through the design process to the eventual final costing and <br />assistance in enacting ordinances to effectuate the proposed design. <br />tIncreased pressures of development on the City of Miramar necessitated <br />Landscape Corridor Guidelines to be established to provide unification and an <br />' overall design theme for the citywide corridors to guide and keep pace with <br />increased growth. Concurrently, the MLA engineering staff completed a <br />master roadway network plan within the City limits which provided a <br />' compliment to the landscape guidelines, as well as, for use in integration into <br />the City's overall GIS database. Working closely with the engineering staff on <br />the development of typical roadway sections, the landscape architectural <br />' design staff provided direction on roadway section designs to allow for <br />optimum landscaping of the corridors, particularly with regard to applying <br />sight distance clear zones and landscaping per FDOT standard indexes 545, <br />' 546 and 700. Utilization of curbing in lieu of open section was also <br />encouraged to optimize landscaping adjacent to the roadways within the <br />designated right -of -way areas. <br />IClient Reference: <br />' Robert Payton, Acting City Manager <br />City of Miramar <br />(954) 967 -1610 <br />t <br />I\\MILEG \VOLI\ Non - Project \Landscaping \Proposals \3869 sunny isles \Relevant Experience.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.