My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Redland #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 01-12-01 Golden Shores Drainage
>
Redland #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2012 4:39:16 AM
Creation date
12/29/2010 2:05:32 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Drainage
Bid No. (xx-xx-xx)
01-12-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In addition to the current projects, listed below, the company operates two Rock Pits. These pit <br />operations, located on Redland Road, in Homestead, include all aspects and methods for open mine <br />excavation of limerock materials in the Dade County area. This pit operation was begun back in 1957 <br />by Redland Rock and has since passed on to the company. In the excavation of the limerock <br />materials, use of explosives have been used to break the underground rock materials; draglines, <br />owned by the company, are used to accomplish the excavation of the materials to a stockpile. Some <br />of this material is "crushed" for Baserock use in roadway construction, and some has been used for <br />raising elevation of several sites in the Homestead, Dade County area. In operating this pit, the <br />company has set -up and maintained a computerized Scale House for purposes of maintaining control <br />and determining billable materials moved. This is an on -going operation, expected to last for the next <br />two to three years. <br />The Company also maintains a pit operation at The Florida Power and Light Turkey Point Nuclear <br />Power Plant site. The materials excavated for the cooling canals at the plant site were placed in <br />stockpiles along the excavated canal. The Company has crushing, loading, hauling and scale house <br />operation set -up at this site. This is also an on -going operation which is expected to continue until <br />such time as all stockpiled materials are removed. <br />:7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.