My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(01-12-02) Const. Mgr. for new City Hall
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 5:08:58 AM
Creation date
12/29/2010 2:35:14 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Const. Mgr. for City Hall
Bid No. (xx-xx-xx)
01-12-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the State of Florida Department of Transportation, The State of Florida <br />Department of Environmental Protection, Miami -Dade County Department of <br />Environmental Resources Management, Miami -Dade County Fire Department, <br />The U.S. Army Corps of Engineers, City of Sunny Isles Beach Zoning and City of <br />Sunny Isles Beach Building Department and any and all authorities which may <br />have jurisdiction. <br />5. Proposal. <br />5.1 Instructions. Sealed Proposals, consisting of one (1) original and four (4) copies, <br />will be received until, and publicly opened at 10:00 a.m., Thursday, January 17, <br />2002, in the Commission Chambers, 17070 Collins Avenue, Suite 250, Sunny <br />Isles Beach, Florida, 33160. <br />The envelope must be clearly marked: <br />"IMPORTANT INFORMATION ENCLOSED FOR CITY MANAGER" <br />Thursday, January 17, 2002, 10:00 A.M. <br />BID NO. 01-12-02 <br />Any response received after 10:00 a.m., on Thursday, January 17, 2002, will be <br />returned to the proposer unopened. No faxes or e-mail will be accepted. The <br />responsibility for submitting_ qualifications before the stated time and date is <br />solely strictly the responsibility of the proposer. The City is not responsible for <br />delays caused by mail, courier service, including U.S. Mail, or any other <br />orcnrrence_ <br />5.2 Initial Task. The first task will be to advise the City Manager with respect to <br />conceptual design scheme for a City Hall and accessory structure(s) related to the <br />City Hall, as now specifically outlined in Section 4 above. <br />5.3 Availability to, and coordination with the City. <br />Respondent will be available throughout the design phase of the project, to <br />resolve any related issues and to make recommendations to the City Manager <br />regarding cost saving methods. <br />b. Respondent will be expected to coordinate with designated City Personnel <br />and may be required, should the City choose, to coordinate on all or some of <br />the project phases with a Construction Manager selected by the City and <br />responsible directly to the City under separate contract. <br />5.4 Cancellation of Requests for Qualifications. An invitation for qualifications, or <br />other solicitation may be cancelled, postponed or re- advertised, or any or all <br />respondents may be rejected in whole, or in part, as may be specified, within the <br />City's sole discretion. The reasons therefore shall be made part of the file. Each <br />solicitation issued by the City shall state that the solicitation may be cancelled and <br />that any respondent may be rejected, in whole or in part, within the sole discretion <br />of the City. Notice of cancellation shall be sent to all businesses solicited. The <br />Page 3 of 10 <br />RFQ For Construction Management Services 12118101 11:00 AM <br />
The URL can be used to link to this page
Your browser does not support the video tag.