My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
The Weitz
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(01-12-02) Const. Mgr. for new City Hall
>
The Weitz
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2012 9:59:05 PM
Creation date
12/29/2010 2:49:53 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Const. Mgmt. for City Hall
Bid No. (xx-xx-xx)
01-12-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
cm <br />COHEN <br />PLAZA TOWER 1 <br />Englewood, Colorado <br />•Liu, <br />upµ <br />FACILITY TYPE <br />Office /retail <br />CLIENT <br />Chevron Land and Development Co. <br />•' <br />San Ramon, California <br />• <br />j�.�., <br />DESIGNER <br />WZMH Group <br />Denver, Colorado <br />SIZE <br />525, 000 sf office /retail <br />r488, <br />000 sf structured parking <br />' FEATURES <br />This suburban mixed -use project includes a 22 -story <br />• <br />office building, 10, 000 sf of retail, a 25, 000 sf <br />geophysical laboratory, and a 1400 space parking <br />• <br />structure. The construction of this building incorporates <br />large barrel vaulted glazing, as well as polished granite <br />slabs imbedded in the precast concrete skin. Construction <br />• <br />was coordinated around an existing highway overpass <br />which remained open throughout the construction <br />. <br />schedule. <br />
The URL can be used to link to this page
Your browser does not support the video tag.