My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
The Weitz
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(01-12-02) Const. Mgr. for new City Hall
>
The Weitz
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2012 9:59:05 PM
Creation date
12/29/2010 2:49:53 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Const. Mgmt. for City Hall
Bid No. (xx-xx-xx)
01-12-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINORITY/WOMEN OWNED BUSINESS PLAN <br />To conclude, The Weitz Company has worked for the following local public agencies over the past <br />several years and has successfully met or exceeded each of their minority business requirements: <br />PROJECT NAME <br />MWBE % <br />TRADES USED <br />South Florida Waste <br />15.1% <br />Site Work, Flooring, Fencing, <br />Management Building B -1 <br />Plumbing, Concrete Finish, <br />Roofin , Fire Protection <br />Palm Tran Bus Maintenance <br />18.0% <br />Earthwork, Plumbing, Paving, <br />Facility <br />Truck Equipment, Specialties, <br />Flooring <br />Meyer Amphitheatre <br />12.4% <br />Masonry, Plumbing, HVAC <br />Palm Springs Elementary <br />15.0% <br />Fencing, Glazing, Irrigation, <br />School <br />Electrical <br />North County Regional Library <br />28.6% <br />Paving, Masonry, Earthwork, <br />HVAC, Plumbing <br />Forest Hill High School Media <br />20.9% <br />Paving, Fencing, Plumbing, <br />Center <br />Electrical <br />Solid Waste Authority Sludge <br />14.0% <br />Paving, Landscaping, Concrete <br />Compost Facility <br />Finish, Flooring <br />Okeechobee Boulevard Library <br />16.6% <br />Earthwork, Glazing, Concrete <br />Finish, Flooring <br />Kravis Center Parking Garage <br />13.9% <br />Earthwork, Concrete Finish, <br />Fencin , Waterproofing <br />In every instance, the actual MWBE participation exceeded the established goals for each project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.