My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(11-01-01) Waste Management Svcs.
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 5:05:54 AM
Creation date
1/3/2011 1:54:08 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Waste Management Services
Bid No. (xx-xx-xx)
11-01-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.44.5. All Work performed for the Contractor by a Sub - <br />Contractor shall be pursuant to an appropriate <br />agreement between the Contractor and the Sub - <br />Contractor. <br />1.44.6. The Contractor shall be responsible for the coordination <br />of the trades, Sub - Contractors and material and <br />men engaged upon their Work: <br />1.44.6.1. The Contractor shall cause appropriate <br />provisions to be inserted in all subcontracts relative <br />to the Work to bind Sub - Contractors to the <br />Contractor by the terms of these General Conditions <br />and other Contract Documents insofar as applicable <br />to the Work of Sub - Contractors, and give the <br />Contractor the same power as regards to <br />terminating any subcontract that the City may <br />exercise over the Contractor under any provisions of <br />the Contract Documents. <br />1.44.6.2. The City will not undertake to settle <br />any differences between the Contractor and their <br />Sub - Contractors or between Sub - Contractors. <br />1.44.6.3. If in the opinion of the City, any Sub - <br />Contractor on the Project proves to be incompetent <br />or otherwise unsatisfactory; they shall be promptly <br />replaced by the Contractor if and when directed by <br />the City in writing. <br />1.45 Laws and Regulations: The Contractor will give all <br />notices and comply with all laws, ordinances, rules and <br />regulations applicable to the Work. If the Contractor observes <br />that the Specifications are at variance therewith, they will give <br />the City prompt written notice thereof, and any necessary <br />changes shall be adjusted by an appropriate modification. If <br />the Contractor performs any Work knowing it to be contrary to <br />such laws, ordinances, rules and regulations, and without such <br />notice to the City, they will bear all costs arising wherefrom. <br />1.46 Taxes: The City of Sunny Isles Beach is exempt from <br />sales tax imposed by the State and /or Federal Government. <br />Florida Sales Tax Exemption No. 23 -00- 477131 -54C appears on <br />each purchase order. Exemption certificates are available upon <br />request. <br />1.47 Safety and Protection: The Contractor will be responsible <br />for initiating, maintaining and supervising all safety precautions <br />and programs in connection with the Work. They will take all <br />necessary precautions for the safety of, and will provide the <br />necessary protection to prevent damage, injury or loss to: <br />1.47.1. All employees and other persons who may be <br />affected thereby; <br />1.47.2. All the Work and all materials or equipment to be <br />incorporated therein, whether in storage on or off the site; <br />1.47.3. Other property at the site or adjacent thereto, <br />including trees, shrubs, lawns, walks, pavements, <br />roadways, structures and utilities not designated for <br />removal, relocation or replacement in the course of <br />construction; and <br />1.47.4. The Contractor will designate a responsible member <br />of their organization at the site whose duty shall be <br />the prevention of accidents. This person shall be the <br />PAGE 10 OF 28 <br />BID NO. 11 -01 -01 <br />Contractor's Superintendent unless otherwise <br />designated in writing by the Contractor to the City. <br />1.48 Emergencies: In emergencies affecting the safety <br />of persons or the Work or property at the site or adjacent <br />thereto, the Contractor, without special instruction or <br />authorization from the City, is obligated to act, at their <br />discretion, to prevent threatened damage, injury or loss. They <br />will give the City prompt written notice of any significant <br />changes in the Work or deviations from the Contract <br />Documents caused thereby. If the Contractor believes that <br />additional Work done by them in an emergency which arose <br />from causes beyond their control entitles them to an increase in <br />the Contract Price or an extension of the Contract Time, they <br />may make a claim therefore as provided in this document. <br />1.48.1. The Contractor will also submit to the City for <br />review, with such promptness as to cause no delay <br />in Work, all samples and photographs required by <br />the Contract Documents. All samples and <br />photographs will have been checked by and <br />stamped with the approval of the Contractor, <br />identified clearly as to material, manufacturer, any <br />pertinent catalog numbers and the use for which <br />intended. <br />1.48.2. At the time of each submission, the Contractor will <br />in writing call the City's attention to any deviations <br />that the photographs or sample may have from the <br />requirements of the Contract Documents. <br />1.48.3. The City will review with responsible promptness <br />Photographs and Samples, but their review shall be <br />only for conformance with the design concept of the <br />Project and for compliance with the information <br />given in the Contract Documents. The Contractor <br />will make any corrections required by the City and <br />will return the required number of corrected copies <br />of Photographs and resubmit new samples until the <br />review is satisfactory to the City. <br />1.48.4. No Work requiring a Photograph or sample <br />submission shall be commenced until the submission <br />has been reviewed by the City. A copy of each <br />Photograph and each approved sample shall be kept <br />in good order by the Contractor at the site and shall <br />be available to the City. <br />1.48.5. The City's review of Photographs or samples shall <br />not relieve the Contractor from their responsibility <br />for any deviations from the requirements of the <br />Contract Documents unless the Contractor has in <br />writing called the City's attention to each deviation <br />at the time of submission and the City has given <br />written approval to the specific deviation, nor shall <br />any review by the City relieve the Contractor from <br />responsibility for supplying the plant material as <br />specified <br />1.49. Public Convenience and Safety: The Contractor <br />shall, at all times, conduct the Work in such a manner <br />as to insure the least practicable obstruction to public <br />travel. The convenience of the general public and of <br />the residents along and adjacent to the area of Work <br />shall be provided for in a satisfactory manner, <br />consistent with the operation and local conditions. <br />During the day, access to private property shall be for <br />
The URL can be used to link to this page
Your browser does not support the video tag.