Laserfiche WebLink
obtain the best workmanship possible for the entire Project, and all components of the Work shall be installed or <br />erected in accordance with the best practices of the particular trade. <br />3.6 The CONTRACTOR shall be responsible for making the construction of habitable structures under this <br />Contract rain proof, and for making equipment and utility installations properly perform the specified function. <br />If they are prevented from so doing by any limitations of the Drawings or Specifications, the CONTRACTOR shall <br />immediately notify the CONSULTANT in writing of such limitations before proceeding with construction in the area <br />where the problem limitation exists. <br />3.7 Manufacturer's literature, when referenced, shall be dated and numbered and is intended to establish the <br />minimum requirements acceptable. Whenever reference is given to codes, or standard specifications or other data <br />published by regulating agencies or accepted organizations, including but not limited to National Electrical Code, <br />applicable State Building Code, Federal Specifications, ASTM Specifications, various institute specifications, and <br />the like, it shall be understood that such reference is to the latest edition including addenda in effect on the date of <br />the Bid. <br />3.8 Brand names where used in the technical specifications, are intended to denote the standard or quality required <br />for the particular material or product. The term "equal" or "equivalent ", when used in connection with brand names, <br />shall be interpreted to mean a material or product that is similar and equal in type, quality, size, capacity, <br />composition, finish, color and other applicable characteristics to the material or product specified by trade name, <br />and that is suitable for the same use capable of performing the same function, in the opinion of the CONSULTANT, <br />as the material or product so specified. Proposed equivalent items must be approved by CONSULTANT before <br />they are purchased or incorporated in the Work. (When a brand name, catalog number, model number, or other <br />identification, is used without the phrase "or equal ", the CONTRACTOR shall use the brand specified). <br />ARTICLE 4 - AVAILABILITY OF LANDS SUBSURFACE CONDITIONS REFERENCE POINTS <br />Availability of Lands: <br />4.1 The CITY will furnish, as indicated in the Contract Documents, the lands upon which the Work is to be done, <br />rights -of -way for access thereto, and such other lands which are designed for the use of the CONTRACTOR. <br />Easements for permanent structures or permanent changes in existing facilities will be obtained and paid for by the <br />CITY unless otherwise specified in the Contract Documents. Other access to such lands or rights -of -way for the <br />CONTRACTOR'S convenience shall be the responsibility of the CONTRACTOR. <br />The CONTRACTOR will provide for all additional lands and access thereto that may be required for temporary <br />construction facilities or storage of material and equipment. <br />4.2 The CITY will, upon request, furnish to the BIDDERS, copies of all available boundary surveys and subsurface <br />tests at no cost. <br />Subsurface Conditions: <br />4.3 The CONTRACTOR acknowledges that they have investigated prior to bidding and satisfied themselves as <br />to the conditions affecting the Work, including but not restricted to those bearing upon transportation, disposal, <br />handling and storage of materials, availability of labor, water, electric power, roads and uncertainties of weather, <br />river stages, tides, water tables or similar physical conditions at the site, the conformation and conditions of the <br />ground, the character of equipment and facilities needed preliminary to and during prosecution of the Work. The <br />CONTRACTOR further acknowledges that they have satisfied themselves as to the character, quality and quantity <br />of surface and subsurface materials or obstacles to be encountered insofar as this information is reasonably <br />ascertainable from an inspection of the site, including all exploratory work done by the CITY /CONSULTANT on <br />00710-6 <br />