My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 02-03-01 Landscape Improv.
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 1:55:59 AM
Creation date
1/5/2011 9:39:34 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Landscape Improv.
Bid No. (xx-xx-xx)
02-03-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work to bind Subcontractors to the CONTRACTOR by the terms of these General Conditions and other <br />Contract Documents insofar as applicable to the Work of Subcontractors, and give the CONTRACTOR the <br />same power as regards to terminating any subcontract that the CITY may exercise over the CONTRACTOR <br />under any provisions of the Contract Documents. <br />6.12.2 The CITY or CONSULTANT will not undertake to settle any differences between the CONTRACTOR <br />and their Subcontractors or between Subcontractors. <br />6.12.3 If in the opinion of the CONSULTANT, any Subcontractor on the Project proves to be incompetent <br />or otherwise unsatisfactory, they shall be promptly replaced by the CONTRACTOR if and when directed by the <br />CONSULTANT in writing. <br />Patent Fees and Rovalties <br />6.13 The CONTRACTOR will pay all license fees and royalties and assume all costs incident to the use of any invention, <br />design, process or device which is the subject of patent rights or copyrights held by others. They will indemnify and hold <br />harmless the CITY and the CONSULTANT and anyone directly or indirectly employed by either of them from against <br />all claims, damages, losses and expenses (including attorney's fees) arising out of any infringement of such rights during <br />or after the completion of the Work, and shall defend all such claims in connection with any alleged infringement of such <br />rights. <br />6.14 The CONTRACTOR shall be responsible for determining the application of patent rights and royalties materials, <br />appliances, articles or systems prior to bidding. However, they shall not be responsible for such determination on systems <br />which do not involve purchase by them of materials, appliances and articles. <br />Permits : <br />6.15 The CONTRACTOR will secure and pay for all construction permits and licenses and will pay for all governmental <br />charges and inspection fees necessary for the prosecution of the Work, which are applicable at the time of his Bid. <br />When such charges are normally made by the CITY and when so stated in the Special Conditions, there will be no charges <br />to the CONTRACTOR The CITY shall assist the CONTRACTOR, when necessary, in obtaining such permits and <br />licenses. The CONTRACTOR will also pay all public utility charges. <br />Electrical Power and Liehtin : <br />6.16 Electrical power required during construction shall be provided by each prime CONTRACTOR as required by <br />them. This service shall be installed by a qualified electrical Contractor approved by the CONSULTANT. Lighting shall <br />be provided by the CONTRACTOR in all spaces at all times where necessary for good and proper workmanship, for <br />inspection or for safety. No temporary power shall be used off temporary lighting lines without specific approval of the <br />CONTRACTOR. <br />Laws and Regulations : <br />6.17 The CONTRACTOR will give all notices and comply with all laws, ordinances, rules and regulations applicable <br />to the Work. If the CONTRACTOR observes that the Specifications or Drawings are at variance therewith, they will <br />give the CONSULTANT prompt written notice thereof, and any necessary changes shall be adjusted by an appropriate <br />modification. If the CONTRACTOR performs any Work knowing it to be contrary to such laws, ordinances, rules and <br />regulations, and without such notice to the CONSULTANT, they will bear all costs arising therefrom; however, it shall <br />not be their primary responsibility to make certain that the Drawings and Specifications are in accordance with such laws, <br />ordinances, rules and regulations. <br />00710-11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.