My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
B&A Construction
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 02-03-01 Landscape Improv.
>
Responses
>
B&A Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2012 12:19:27 AM
Creation date
1/5/2011 10:21:17 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Landscape Improv.
Bid No. (xx-xx-xx)
02-03-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B &A CONSTRUCTION SERVICE GROUP, INC <br />12380 SW 1301, Street, Miami, FL 33186 <br />Phone: (305) 254 -9826 - Fax: (305) 233 -9373 <br />GENERAL CONTRACTOR - LIC. NO. 0012113 <br />RESUME: Mr.LAUREL E. CASTETTER <br />CONSTRUCTION & ENGINEERING <br />EDUCATION: BACHELOR OF SCIENCE IN CIVIL ENGINEERING <br />INDIANA INSTITUE OF TECHNOLOGY <br />REGISTRATION: GENERAL ENGINEERING CONTRACTORS LICENSE <br />YEARS EXPERIENCE: 40 <br />® AFFILIATIONS: MEMBER OF THE SOUTH DADE CHAMBER OF COMMERCE - SERVE ON THE BOARD OF DIRECTORS <br />FOR SIX YEARS. VICE - PRESIDENT FOR TWO YEARS, AND CHAIRMAN OF THE PLANNING AND <br />DEVELOPMENT COMMITTEE FOR EIGHT YEARS. RECEIVED OUTSTANDING CITIZENSHIP AWARD IN 1975 <br />RELEVANT EXPERIENCE: <br />2000 B&A CONSTRUCTION SERVICES GROUP <br />VICE - PRESIDENT - ENGINEERING <br />1979 -1993 FLORIDA ROADS COMPANY <br />DURING HIS 13 YEARS OF SERVICE WITH FLORIDA ROADS COMPANY, MR. CASTETTER WAS INVOLVED IN <br />ALL ASPECTS OF THE PUBLIC WORKS PROJECTS UNDERTAKEN BY THE COMPANY IN SOUTH EAST FLORIDA. <br />1957 -1979 SAVIN BROTHERS, INC. <br />DURING MORE THAN 20 YEARS OF EMPLOYMENT WITH SAVIE BROTHERS, INC., MR. CASTETTER WAS INVOLVED <br />IN THE CONSTRUCTION OF HIGHWAYS, DAMS, POWER PLANTS, BRIDGES, WASTE WATER TREATMENT PLANTS, <br />WAREHOUSES, OIL PIPELINES, TUNNELS, AND LAND DEVELOPMENT. HE WAS PERSONALLY RESPONSIBLE AS GENERAL <br />SUPERINTENDENT FOR THE SUPERVISION OF VARIOUS BRIDGES AND ROADS IN VERMONT, MASSACHUSETTS, NEW YORK, <br />CONNECTICUT AND FLORIDA, WHERE HE PERSONALLY SUPERVISED THE CONSTRUCTION OF BRIDGES ON THE FLORIDA <br />TURNPIKE AND THE SOUTH DADE EXPRESSWAY. <br />1953-1957 HOWARD, NEEDLES. TAMMEN & BERGENDOFF <br />MR. CASTETTER WORKED AS OFFICE ENGINEER. HIS MAIN INVOLVEMENT DURING HIS TENURE WAS THE 66 MILE <br />EXTENSION OF THE MAINE TURNPIKE AND THE 123 MILE EXTENSION OF THE MASSACHUSETTS TURNPIKE. THESE TWO <br />PROJECTS INVOLVED ALMOST 200 BRIDGES, INCLUDING MAJOR RIVER CROSSINGS, RAILROAD CROSSINGS, AND GRADE <br />SEPARATION STRUCTURES. <br />A BRIEF SUMMARY OF MR. CASTETTER' S DUTIES THROUGH HIS FORTY YEARS OF EXPERIENCE ENCOMPASS THE <br />FOLLOWING: <br />ENGINEERING DESIGN AND DETAIL ON SPECIAL CONSTRUCTION DEVICES AND TECHNIQUES, COORDINATING WITH <br />CONSULTING ENGINEERS, STATE HIGHWAY DEPARTMENTS. U. S. ARMY CORPS OF ENGINEERS, <br />PROPOSING AND FOLLOWING THROUGH ON REQUIRED CHANGES, OBTAINING FINAL APPROVAL <br />OF PROJECTS, AND TRAINING ENGINEERS AND SUPERINTENDENTS ON SPECIAL PROBLEMS THAT <br />OCCURRED DURING CONSTRUCTION. <br />ESTIMATING PREPARED QUANTITY TAKE - OFFS AND COST ESTIMATES, PREPARED FINAL BIDDING DOCUMENT ON <br />& BIDDING MAJOR HIGHWAYS, HYDRO - ELECTRIC DAMS, FLOOD CONTROL PROJECTS, TUNNELS, ATOMIC <br />POWER PLANTS, WASTE WATER TREATMENT PLANTS, BRIDGES, HOUSING PROJECTS, PRISONS <br />SCHOOLS, AND MANY OTHER FACILITIES. <br />-Sod & Landscaping - Sprinkler Systems & Wells -Water & Sewer - Paving & Drainage - Roofing Systems <br />
The URL can be used to link to this page
Your browser does not support the video tag.