My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-04-01) Entrance Signage
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 2:10:10 AM
Creation date
1/5/2011 4:31:40 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Entrance Signage
Bid No. (xx-xx-xx)
03-04-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' furnishing materials and equipment for the Project, subject to an agreement under which an interest therein or <br />encumbrance thereon is retained by the seller or otherwise imposed by the CONTRACTOR or such other person. <br />1 Approval of Payment <br />14.4 The CONSULTANT'S approval of any payment requested in an Application for Payment shall constitute a <br />' representation by them to the CITY, based on the CONSULTANT'S on site observations of the Work in progress as an <br />experienced and qualified design professional and on their review of the Application for Payment and supporting data, <br />that the Work has progressed to the point indicated, that, to the best of their knowledge, information and belief, the <br />' quality of the Work is in accordance with the Contract Documents (subject to an evaluation of the Work as a functioning <br />Project upon substantial completion, to the results of any subsequent tests called for in the Contract Documents and any <br />qualifications stated in their approval); and that the CONTRACTOR is entitled to payment of the amount approved. <br />However, by approving any such payment the CONSULTANT shall not thereby be deemed to have represented that they <br />r made exhaustive or continuous on -site observations to check the quality or the quantity of the Work, or that they have <br />reviewed the means, methods, techniques, sequences and procedures of construction or that they had made any <br />examination to ascertain how or for what purpose the CONTRACTOR has used the moneys paid or to be paid to them <br />on account of the Contract Price, or that title to any Work, materials, or equipment has passed to the CITY free and clear <br />of any liens. <br />14.5 The CONTRACTOR shall make the following certification on each request for payment: <br />"I hereby certify that the labor and materials listed on this request for payment have been used in the construction of this <br />Work or that all materials included in this request for payment and not yet incorporated into the construction are now on <br />the site or stored at an approved location, and payment received from the last request for payment has been used to make <br />payments to all first tier Subcontractors and suppliers except as listed below ". <br />14.6 The CONSULTANT may refuse to approve the whole or any part of any payment if, in their opinion, they are <br />unable to make such representations to the CITY. They may also refuse to approve any payment, or because of <br />subsequently discovered evidence or the results of subsequent inspection or tests, nullify any such payment previously <br />approved, to such extent as may be necessary in their opinion to protect the CITY from loss because: <br />14.6.1 The Work is defective, or completed Work has been damaged requiring correction or replacement, <br />14.6.2 The Work for which payment is requested cannot be verified, <br />14.6.3 Claims or Liens have been filed or there is reasonable evidence indicating the probable filing thereof, <br />14.6.4 The Contract Price has been reduced because of modifications, <br />14.6.5 The CITY has been required to correct defective Work or complete the Work in accordance with <br />Article 13. <br />14.6.6 Of unsatisfactory prosecution ofthe Work, including failure to clean up as required by paragraphs 6.29 <br />and 6.30, <br />14.6.7 Of persistent failure to cooperate with other contractors on the Project and persistent failure to carry <br />out the Work in accordance with the Contract Documents, <br />14.6.8 Of liquidated damages payable by the CONTRACTOR, or <br />14.6.9 Of any other violation of, or failure to comply with provisions of the Contract Documents. <br />00710-23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.