My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hosepower Electric #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-09-01 SIB Entrance Signs (Electrical)
>
Hosepower Electric #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 11:34:04 PM
Creation date
1/6/2011 10:20:49 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SIB Entrance Signs (Electric)
Bid No. (xx-xx-xx)
03-09-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IPART 2 - PRODUCTS <br />' <br />2.01 SOIL MATERIALS <br />A. <br />Satisfactory Soil Materials: ASTM D2487 soil classification groups <br />' <br />GW, GP, GM, SM, SW and SP. <br />B. <br />Unsatisfactory Soil Materials: ASTM D2487 soil classification groups <br />Unauthorized excavation, as well as remedial work directed by <br />GC, SC, ML, MH, CL, CH, OL, OH and PT. <br />' <br />C. <br />Subbase Material: Naturally or artificially graded mixture of natural or <br />C. Additional Excavation: <br />crushed gravel, crushed stone, crushed slag, natural or crushed sand. <br />D. <br />Drainage Fill: Washed, evenly graded mixture of crushed stone, or <br />' <br />crushed or uncrushed gravel, with 100 percent passing a 1-1/2 in. <br />will be paid on basis of contract conditions relative to changes <br />sieve and not more than 5 percent passing a No. 4 sieve. <br />in work. <br />E. <br />Backfill and Fill Materials: Satisfactory soil materials free of clay, rock <br />or gravel larger than 2 in. in any dimension, debris, waste, frozen <br />' <br />materials, vegetable and other deleterious matter. <br />PART 3 - <br />EXECUTION <br />3.01 EXCAVATION <br />' <br />A. Excavation is Unclassified, and includes excavation to subgrade <br />elevations indicated, regardless of character of materials and <br />obstructions encountered. <br />B. Unauthorized Excavation: Removal of materials beyond indicated <br />subgrade elevations or dimensions without specific direction. <br />Unauthorized excavation, as well as remedial work directed by <br />Engineer, shall be at Contractor's expense. <br />' <br />C. Additional Excavation: <br />1. When unsuitable bearing materials are encountered at required <br />subgrade elevations, carry excavations deeper and replace <br />excavated material as directed by Engineer. <br />2. Removal of unsuitable material and its replacement as directed <br />will be paid on basis of contract conditions relative to changes <br />in work. <br />1 09/03 02200 -2 03- 4138.A -R <br />
The URL can be used to link to this page
Your browser does not support the video tag.