Laserfiche WebLink
B. Grading Surface of Fill under Building Slabs: Grade smooth and even, <br />free of voids, compacted as specified, and to 1/2 in. below required <br />elevation. <br />3.05 FIELD QUALITY CONTROL <br />A. Contractor will engage soil testing and inspection service for quality <br />control testing during earthwork operations. <br />B. Allow testing service to inspect and approve subgrades and fill layers <br />before further construction work is performed. <br />C. If in opinion of Engineer, based on testing service reports and <br />inspection, subgrade or fills which have been placed below specified <br />density, provide additional compaction and testing at no additional <br />expense to Owner. <br />3.06 CLEANING AND PROTECTION <br />A. Protect newly graded areas from traffic and erosion. Keep free of <br />trash and debris. <br />B. Repair and re- establish grades in settled, eroded, and rutted areas to <br />specified tolerances. <br />C. Remove excess excavated and waste materials, including unacceptable <br />excavated material, trash and debris, and legally dispose of it off <br />Owner's property. <br />END OF SECTION <br />09/03 02200 -6 03- 4138.A -R <br />