My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hosepower Electric #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-09-01 SIB Entrance Signs (Electrical)
>
Hosepower Electric #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 11:34:04 PM
Creation date
1/6/2011 10:20:49 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SIB Entrance Signs (Electric)
Bid No. (xx-xx-xx)
03-09-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ril <br />1� <br />D. Storage: <br />1. Balled and burlapped plant stock: Deliver direct from nursery. <br />2. Bare root plant material: Deliver direct from supplier. <br />3. Protect roots of all plant material from drying or other possible <br />injury. Keep plant root ball and crown moist at all times. <br />1 4. Store plants in shade and protect from weather. Heel in trees in <br />a vertical position as required. Irrigate all stored plants as <br />required. <br />5. Maintain and protect plant material not to be planted within four <br />' hours. Plant palms upon delivery. <br />' E. Handling: <br />1 . Do not drop plants. <br />2. Do not pick -up container or balled plants by stems or trunks. <br />' 3. Do not use chains or cables on any trees or palms. Handle <br />using nylon straps, 2 inche width min. <br />1 1.06 JOB CONDITIONS <br />A. Planting Season: Perform actual planting only when weather and soil <br />conditions are suitable in accordance with locally accepted practice. <br />B. Verify that all existing trees to remain are properly identified and <br />barricaded to prevent damage under this and future construction. <br />Landscape Contractor shall be responsible for maintaining adequate <br />identification and barricading of all existing plant material to remain <br />throughout the installation and required maintenance period. <br />1.07 GUARANTEE <br />A. Guarantee all plant material as for one year after substantial <br />completion. <br />B. weelkseofe ejection under this need foret twelve monptlhsef within two of <br />' installation. 1 <br />C. Repair damage to other plants, lawn or construction work during plant <br />' replacement at no cost to the Owner (this includes, but is not limited <br />to, damage to curbs, walks, roads, fences, site furnishings, etc.). <br />1 1.08 SCHEDULING <br />A. Install trees, shrubs, and ground cover before lawns are installed. <br />B. Notify Landscape Architect of anticipated installation date at last two <br />weeks in advance. <br />1 09/03 02490 -3 03- 4138.A -R <br />
The URL can be used to link to this page
Your browser does not support the video tag.