My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hosepower Electric #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-09-01 SIB Entrance Signs (Electrical)
>
Hosepower Electric #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 11:34:04 PM
Creation date
1/6/2011 10:20:49 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SIB Entrance Signs (Electric)
Bid No. (xx-xx-xx)
03-09-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00800 <br />SUPPLEMENTARY CONDITIONS <br />change from <br />The following supplements modify, m 1910 add -8, ti <br />1996 Edition. Where any Article <br />n <br />of the Construction Contract, EJCDC Docume <br />Paragraph, <br />or Clause thereof is <br />of the General Conditions is modified or the unaltered provisions shall remain in effect. <br />modified or deleted by these supplements, <br />ARTICLE 1 - DEFINITIONS AND TERMINOLOGY <br />sentence to 1.28 Notice of Award: "When requested by OWNER, the <br />Add the following <br />Notice of Award may be issued by the ENGINEER." <br />Add the following sentence to 1.29 Notice to Proceed: "When requested by OWNER, the <br />Notice to Proceed may be issued by ENGINEER." <br />Add the following terms after Paragraph 1.50: <br />1.51 ARCHITECT /ENGINEER - The person, firm or corporation named as the ENGINEER in <br />the Agreement. <br />1.52 Provide - As used in the Project Manual, means to furnish and install, complete and <br />ready for intended use. <br />�I1.53 Product - As used in the Project Manual, includes materials, fabrications, systems and <br />equipment. <br />1.54 Project Manual -The volume of written construction documents, including the Bidding <br />m le forms and the Contract Documents, such as the Conditions of the <br />n <br />Documents, sa p <br />Contract and the Specifications. <br />ARTICLE 2 - PRELIMINARY MATTERS <br />Add the following to Paragraph 2.01 .: "If the Work is to be commenced prior to execution <br />of the Agreement in response to a letter of intent, CONTRACTOR shall, prior to <br />commencement of the Work, submit evidence satisfactory to OWNER that such bonds will <br />be furnished." <br />In the first line of Paragraph 2.02., change the term "...ten..." to read "...six ...... <br />Delete Paragraph 2.03. and replace with the following: <br />2.03. The date of commencemen�ofProceed Work t isshall be date the eof <br />Proceed. If there is no Notice to <br />CONTRACTOR Agreement or such other date as may be established therein. <br />00800 -1 <br />� 09/03 <br />in a Notice to <br />the OWNER- <br />03- 4138.A -R <br />
The URL can be used to link to this page
Your browser does not support the video tag.