My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hosepower Electric #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-09-01 SIB Entrance Signs (Electrical)
>
Hosepower Electric #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 11:34:04 PM
Creation date
1/6/2011 10:20:49 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SIB Entrance Signs (Electric)
Bid No. (xx-xx-xx)
03-09-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br />B. Copies of working drawings as noted in subparagraph 1.06A above, <br />shall be submitted to the Engineer where required by the Contract <br />Documents or requested by the Engineer, and shall be submitted at <br />least thirty (30) calendar days (unless otherwise specified by the <br />Engineer) in advance of their being required for work. <br />C. Working drawings shall be signed by a Registered Professional <br />Engineer, currently licensed to practice in the State of Florida and shall <br />convey, or be accompanied by, calculation or other sufficient <br />information to completely explain the structure, machine, or system <br />described and its intended manner of use. Prior to commencing such <br />work, working drawings must have been reviewed without specific <br />exceptions by the Engineer, which review will be for general <br />conformance and will not relieve the Contractor in any way from his <br />responsibility with regard to the fulfillment of the terms of the <br />Contract. All risks of error are assumed by the Contractor; the Owner <br />and Engineer shall have no responsibility therefore. <br />1.07 SAMPLES <br />A. The Contractor shall furnish, for the approval of the Engineer, samples <br />required by the Contract Documents or requested by the Engineer. <br />Samples shall be delivered to the Engineer as specified or directed. <br />The Contractor shall prepay all shipping charges on samples. Materials <br />or equipment for which samples are required shall not be used in work <br />until approved by the Engineer. <br />B. Samples shall be of sufficient size and quantity to clearly illustrate: <br />1. Functional characteristics of the product, with integrally related <br />parts and attachment devices. <br />2. Full range of color, texture and pattern. <br />3. A minimum of two samples of each item shall be submitted. <br />C. Each sample shall have a label indicating <br />1. <br />Name of Project <br />2. <br />Name of Contractor and Subcontractor <br />3. <br />Material or Equipment Represented <br />4. <br />Place of Origin <br />5. <br />Name of Producer and Brand (if any) <br />6. <br />Location in Project <br />(Samples of finished materials shall have additional marking that will <br />identify them under the finished schedules.) <br />1 09/03 01340 -6 <br />03- 4138.A -R <br />
The URL can be used to link to this page
Your browser does not support the video tag.