My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hosepower Electric #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-09-01 SIB Entrance Signs (Electrical)
>
Hosepower Electric #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 11:34:04 PM
Creation date
1/6/2011 10:20:49 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SIB Entrance Signs (Electric)
Bid No. (xx-xx-xx)
03-09-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. INTERPRETATION OF BIDDING DOCUMENTS <br />4.1 All questions requiring clarification or interpretation of the Bidding <br />Documents shall be made in writing and shall reach the office of the Owner <br />at least 5 days prior to the date for receipt of bids. Direct all requests to the <br />attention of the Project Engineer at Calvin, Giordano & Associates, Inc. (954) <br />921 -7781. <br />4.2 Any modification or interpretation of the Bidding Documents will be made by <br />Addendum to all who are recorded by the Engineer as having received a <br />complete set of Bidding Documents. <br />4.3 Interpretations or modifications of Bidding Documents made in any manner <br />other than by Addendum will not be binding. <br />4.4 A Bidder, prior to submitting his Bid, shall ascertain that he has received all <br />Addenda issued, and shall acknowledge their receipt in the Bid Form. <br />5. SUBSTITUTIONS <br />5.1 Bidders represent that their Bid is based upon the materials and equipment <br />described in the Bidding Documents. <br />5.2 Requests for substitutions will be considered prior to receipt of bids if they <br />reach the Engineer at least 5 days prior to the date for receipt of bids. <br />5.3 Acceptance by the Engineer of a proposed substitution will be issued in the <br />form of an Addendum or Substitution Request Form. <br />6. QUALIFICATION OF BIDDERS <br />6.1 If requested, the Bidder shall submit to the Engineer, prior to award of <br />contract, a properly completed Contractors Qualification Statement, along <br />with any other evidence of his satisfactory experience and ability to perform <br />the proposed Work. <br />6.2 If requested by the Owner, the Bidder shall submit a certified financial <br />statement, prepared within the past 30 days, indicating current financial <br />resources, liabilities, capital equipment, and past history performance. <br />6.3 Bidders may be disqualified and their bids rejected for any of the following <br />specific reasons: <br />a. Reason to believe that collusion exists among Bidders. <br />b. Determination of lack of competency as may be revealed by <br />qualification statements, financial statements, experience records, or <br />other questionnaires. <br />09/03 <br />00100 -2 03- 4138.A -R <br />
The URL can be used to link to this page
Your browser does not support the video tag.