My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-07-01) SIB Entrance Signs (Electrical)
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 1:44:35 AM
Creation date
1/6/2011 10:58:31 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SIB Entrance Signs (Electrical)
Bid No. (xx-xx-xx)
03-07-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IARTICLE 10 - CHANGES IN THE WORK; CLAIMS <br />Add the following: <br />10.06. Without invalidating the agreement, Owner may, at any time execute appropriate <br />Change Orders for additions and /or deletions in the work of up to 25% of the total <br />contract amount, without a change in the contract unit prices bid. <br />ARTICLE 13 - TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR <br />ACCEPTANCE OF DEFECTIVE WORK <br />13.03. TEST AND INSPECTIONS: <br />Replace 13.03.B. with "All testing shall be paid for by the Contractor." <br />' Add the following sentence to Paragraph 13.07.A.: "Specific and special warranties <br />specified in the Contract Documents are in addition to, and not in lieu of, the contractors <br />general warranty. CONTRACTOR shall not be relieved of general warranty obligations by <br />the specification of specific products or procedures." <br />13.09. OWNER MAY CORRECT DEFECTIVE WORK: <br />Change the first line from: <br />' If Contractor fails within a reasonable time after written notice of Engineer... <br />To read: <br />If Contractor fails within ten (10) calendar days after written notice of Engineer... <br />ARTICLE 14 - PAYMENTS TO CONTRACTOR AND COMPLETION <br />In the first sentence of Paragraph 14.02.A.1., change the phrase "At least twenty days <br />before each progress payment is scheduled (but not more often than once a month) , ..." to <br />read "By no later than the first day of the month, ... ... <br />Add 14.02.A.4: "An original Partial Release of Lien is required from the General <br />Contractor along with the application for Payment No. 1 and for each subsequent <br />application thereafter. For each application for payment (excluding Application No. 1) the <br />Contractor shall submit with the application Partial Releases of Liens for all Notice to <br />Owners that have been received for the project by the Owner and Engineer". <br />In Paragraph 14.02.B., change the beginning of the sentence from "Ten days..." to read <br />"Forty -five days... ". <br />In the first sentence of Paragraph 14.05.A.2., following the word "...Work ...' °, insert the <br />words "...or to place and install equipment... ". <br />At the end of Paragraph 14.07.A.2. after, ...with the Work. Insert, "(iv) acceptance by the <br />Owners and governing agencies. <br />' 06/03 00800 -6 03- 4138.A <br />
The URL can be used to link to this page
Your browser does not support the video tag.