My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Signal Technology
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-07-01) SIB Entrance Signs (Electrical)
>
Signal Technology
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 6:45:02 AM
Creation date
1/6/2011 11:18:22 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SIB Entrance Signs (Electrical)
Bid No. (xx-xx-xx)
03-07-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 1.03 APPROVAL OF MATERIALS <br />A. Only new materials and equipment shall be incorporated in the work. <br />All materials and equipment furnished by the Contractor shall be subject <br />to the inspection and approval of the Engineer. No material shall be <br />' delivered to the work without prior approval of the Engineer. <br />B. Within 30 days after the effective date of the Agreement, the <br />1 Contractor shall submit to the Engineer, data relating to materials and <br />equipment he proposes to furnish for the work. Such data shall be in <br />sufficient detail to enable the Engineer to identify the particular product <br />I and to form an opinion as to its conformity to the specifications. The <br />data shall comply with Paragraph 1.07 of this Section. <br />' C. Facilities and labor for handling and inspection of all materials and <br />equipment shall be furnished by the Contractor. If the Engineer <br />requires, either prior to beginning or during progress of the work, the <br />Contractor shall submit samples of materials for such special tests as <br />may be necessary to demonstrate that they conform to the <br />specifications. Such samples shall be furnished, stored, packed, and <br />shipped as directed at the Contractor's expense. Except as otherwise <br />noted, the Owner will make arrangements for and pay for the tests. <br />D. The Contractor shall submit data and samples sufficiently early to permit <br />consideration and approval before materials are necessary for <br />incorporation in the work. Any delay of approval resulting from the <br />Contractor's failure to submit samples or data promptly shall not be <br />used as a basis of claim against the Owner or the Engineer. <br />E. In order to demonstrate the proficiency of workmen or to facilitate the <br />choice among several textures, types, finishes, and surfaces, the <br />Contractor shall provide such samples of workmanship or finish as may <br />be required. <br />I F. The materials and equipment used on the work shall correspond to the <br />approved samples or other data. <br />1 07/03 01600 -2 03- 4138.A <br />
The URL can be used to link to this page
Your browser does not support the video tag.