My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Signal Technology
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-07-01) SIB Entrance Signs (Electrical)
>
Signal Technology
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 6:45:02 AM
Creation date
1/6/2011 11:18:22 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SIB Entrance Signs (Electrical)
Bid No. (xx-xx-xx)
03-07-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
H. The Contractor shall be responsible for all materials, equipment, and <br />supplies sold and delivered to the Owner under this Contract until final <br />' inspection of the work and acceptance thereof by the Owner. In the <br />event any such material, equipment, and supplies are lost, stolen, <br />damaged, or destroyed prior to final inspection and acceptance, the <br />IContractor shall replace same without additional cost to the Owner. <br />I. Should the Contractor fail to take proper action on storage and handling <br />I of equipment supplied under this Contract within seven days after <br />written notice to do so has been given, the Owner retains the right to <br />correct all deficiencies noted in previously transmitted written notice and <br />rdeduct the cost associated with these corrections from the Contractor's <br />Contract. These costs may be comprised of expenditures for labor, <br />equipment usage, administrative, clerical, engineering and any other <br />' costs associated with making the necessary corrections. <br />1.07 SUBSTITUTIONS AND PRODUCT OPTIONS <br />A. Products List: <br />1. Within 15 days after the effective date of the Agreement, submit <br />to the Engineer a complete list of major products proposed to be <br />used, with the name of the manufacturer and the installing <br />subcontractor. <br />B. Contractor's Options: <br />1. For Products specified only by reference standard, select any <br />product meeting that standard. <br />2. For Products specified by naming several products or <br />manufacturers, select any one of the products or manufacturers <br />named, which complies with the specifications, subject to the <br />base bid procedures outlined under Document 00400 - <br />' Supplemental Bid Form. <br />3. For products specified by naming one or more Products or <br />manufacturers and "or equal ", Contractor must submit a request <br />' as for substitutions for any Product or manufacturer not <br />specifically named. <br />' C. Substitutions: <br />1. For a period of 15 days after the effective date of the Agreement, <br />the Engineer will consider written requests from Contractor for <br />substitution of Products. <br />2. Submit a separate request for each Product, supported with <br />complete data, with drawings and samples as appropriate, <br />1 07/03 01600 -5 03- 4138.A <br />
The URL can be used to link to this page
Your browser does not support the video tag.