Laserfiche WebLink
I <br />A. Grading shall be performed at such places as are indicated on the <br />Drawings, to the lines, grades and elevations shown or as directed by <br />the Engineer and shall be made in such manner that the requirements <br />for formation of embankments can be followed. All unacceptable <br />material encountered, of whatever nature within the limits indicated, <br />shall be removed and disposed of as directed. During the process of <br />excavation, the grade shall be maintained in such condition that it will <br />' be well drained at all times. When directed, temporary drains and <br />drainage ditches shall be installed to intercept or divert surface water <br />which may affect the prosecution or condition of the work. <br />' B. If at the time of excavation it is not possible to place any material in <br />its proper section of the permanent structure, it shall be stockpiled in <br />approved areas for later use. No extras will be considered for the <br />stockpiling or double handling of excavated material. <br />C. The right is reserved to make minute adjustments or revisions in lines <br />or grades if found necessary as the work progresses, due to <br />' discrepancies on the Drawings or in order to obtain satisfactory <br />construction. <br />D. Stones or rock fragments larger than 2 1/2 inches in their greatest <br />dimensions will not be permitted in the top 6 inches of the subgrade <br />line of all fills or embankments. <br />E. All fill slopes shall be uniformly dressed to the slope, cross - section and <br />alignment shown on the Drawings, or as directed by the Engineer. <br />F. In cut, all loose or protruding rocks on the back slopes shall be barred <br />loose or otherwise removed to line or finished grade of slope. All cut <br />' and fill slopes shall be uniformly dressed to the slope, cross - section <br />and alignment shown on the Drawings or as specified by the Engineer. <br />G. No grading is to be done in areas where there are existing pipe lines <br />that may be uncovered or damaged until such lines which must be <br />maintained are relocated, or where lines are to be abandoned, all <br />required valves are closed and drains plugged at manholes. <br />H. The Contractor shall replace all pavement cut or otherwise damaged <br />1 during the progress of the work as specified elsewhere herein or as <br />shown on the Drawings. <br />�1 <br />7 <br />1 07/03 02221-7 03- 4138.A <br />