My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Signal Technology
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-07-01) SIB Entrance Signs (Electrical)
>
Signal Technology
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 6:45:02 AM
Creation date
1/6/2011 11:18:22 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SIB Entrance Signs (Electrical)
Bid No. (xx-xx-xx)
03-07-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br />Fi <br />IPART 1 -GENERAL <br />1.01 SCOPE OF WORK <br />SECTION 02481 <br />SHRUB AND TREE RELOCATION <br />A. Provide all labor, materials, necessary equipment and services to <br />' complete the Fine Grading work, as indicated on the drawings, as <br />specified herein or both, except as for items specifically indicated as <br />"NIC ITEMS ". <br />1.02 RELATED WORK <br />A. Section 02210 - Fine Grading <br />B. Section 02484 - Soil Preparation and Soil Mixes <br />C. Section 02487 - Sodding <br />D. Section 02490 - Trees, Plants, and Groundcover <br />1 1.03 DESCRIPTION <br />A. Plant materials to be relocated on site are designated on the drawings <br />or as directed by the Landscape Architect. <br />B. The Contractor's crew utilized for the relocation of existing trees and <br />shrubs shall have minimum five years experience in relocation of <br />existing plant materials and be recognized by the American Association <br />of Nurserymen. <br />C. Existing trees to remain shall be protected during all construction <br />phases as noted on demolition plan. Any trees or shrubs scarred or <br />destroyed designated to remain will be replaced at the Contractor's <br />expense, with similar species, size and quality. <br />D. Remove other trees, saplings, shrubs, bushes, vines and undergrowth <br />as necessary and as directed by the Landscape Architect to <br />accommodate new plantings. Prepare areas to be planted per <br />Specification Sections 02484, 02487, and 02490. <br />E. Resulting tree pits and shrub bed pits of relocated material shall be <br />backfilled with clean fill and brought back flush with surrounding grade <br />if required. It shall be the contractor's responsibility to correct <br />problems caused by erosion, wind, etc., in the reclaimed area where <br />he has dug. <br />In areas where new plant material will replace relocated plant material, <br />appropriate planting soil mix shall be used as backfill. <br />07/03 02481 -1 03- 4138.A <br />
The URL can be used to link to this page
Your browser does not support the video tag.