Laserfiche WebLink
Exception to Documents <br />Paragraph 3 on page 00300 -3 states that "...Bidder also agrees to complete entire work <br />within 30 days after Contract time commences to run." Please be advised that a longer <br />time line will be required in order to allow FPL sufficient time to make electrical tap. The <br />normal sequence of events is as follows: <br />1. Service points must be built. <br />2. A representative from the City must verify that Service points are built to <br />Contract Documents and to N.E.C. and request a hookup from FPL. (STI will <br />provide the city with signed and notorized document attesting to conformance.) <br />3. Upon receipt of FPL connection fee and set up of account, FPL will set up a work <br />order for the hookup. FPL requires a minimum of three (3) weeks for hookup. <br />It is possible to complete all of the work within 30 days provided submittal and material <br />acquisition time is allowed. If awarded, STI would ask for a construction time of 60 C/D <br />following receipt of materials. <br />Signed: Date: D <br />Kelly D. Wood <br />