Laserfiche WebLink
Electrical Site Plan E -4 <br />Electrical Site Plan E -5 <br />MOT - General Notes <br />MOT — Multilane Divided — Rural <br />MOT — Multilane Divided - Urban <br />' 9.5.2. The CONTRACTOR agrees to indemnify and save harmless the CITY OF SUNNY <br />ISLES BEACH, AND CALVIN GIORDANO & ASSOCIATES, INC., Civil Engineers-Planners- <br />Surveyors, their agents and employees, from or on account of any injuries or damages <br />received or sustained by any person or person during or on account of any operations <br />connected with the construction of these roadway improvements; or by or in consequence of <br />any negligence in connection with the same; or by use of any improper materials or by or on <br />account of any act or omission of the said Contractor, subcontractor, agents, servants, or <br />' employees; and <br />' 9.5.3. The CONTRACTOR agrees to maintain in force at all times during the life of the <br />construction, public liability insurance, by separate certificate, in an amount not less than <br />$1,000,000 for injuries, including willful death, to any one person and subject to those same <br />limits for each person, in an amount not less that $1,000,000 for damages as a result of each <br />occurrence and property damage insurance and in an amount not less than $1,000,000 for <br />damages on any one occurrence. Such policy shall specifically protect the CITY OF SUNNY <br />ISLES BEACH, AND CALVIN, GIORDANO & ASSOCIATES, INC., Civil Engineers- Planners- <br />1 Surveyors, their agents and employees, by making them an additional insured, and shall not <br />be modified or canceled without thirty (30) days written notice to the CITY OF SUNNY ISLES <br />BEACH. <br />9.5.4 Should the final completion and acceptance of the work herein embraced together <br />with any modification or additions be delayed beyond the time herein set because of lace of <br />performance by the Contract, it is understood and agreed that aside from any other liquidated <br />damage per day for such delay from such time until the work is completed and accepted as <br />herein provided, all costs of engineering and inspection on behalf of the Owner will be <br />charged to the contractor and deducted from any estimate or payment otherwise due and <br />' payable to him from time to time. The costs of engineering and inspection which may be <br />charged to the Contractor by the Owner under this article shall be equal to the Engineer's <br />charges to the Owner. <br />07/03 00500 -6 03- 4138.A <br />1 <br />