My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Signal Technology
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-07-01) SIB Entrance Signs (Electrical)
>
Signal Technology
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 6:45:02 AM
Creation date
1/6/2011 11:18:22 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SIB Entrance Signs (Electrical)
Bid No. (xx-xx-xx)
03-07-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
This document has important legal consequences; consultation with an attorney is encouraged with respect to its use or <br />modification. This document should be adapted to the particular circumstances of the contemplated Project and the <br />Controlling Law. <br />STANDARD <br />GENERAL CONDITIONS <br />' OF THE <br />CONSTRUCTION CONTRACT <br />' Prepared by <br />ENGINEERS JOINT CONTRACT DOCUMENTS COMMTITEE <br />and <br />�II Issued and Published Jointly By <br />National Society of <br />Professional Engineers AM <br />' AMERICAN CONSULTING Professional Engineers in Private Practice AMERICAN SOCIETY OF <br />ENGINEERS COUNCIL CIVIL ENGINEERS <br />' PROFESSIONAL ENGINEERS IN PRIVATE PRACTICE <br />a practice division of the <br />NATIONAL SOCIETY OF PROFESSIONAL ENGINEERS <br />1 AMERICAN CONSULTING ENGINEERS COUNCIL <br />IAMERICAN SOCIETY OF CIVIL ENGINEERS <br />This document has been approved and endorsed by <br />The Associated General < - Contractors of America _ <br />M <br />Construction Specifications Institute <br />Ad- <br />T��vr <br />These General Conditions have been prepared for use with the Owner-Contractor Agreements (No. 1910 -8 -A -1 or 1910 - <br />8-A-2) (1996 Editions). Their provisions are interrelated and a change in one may necessitate a change in the other. <br />Comments concerning their usage are contained in the EJCDC User's Guide (No. 1910 -50). For guidance in the <br />preparation of Supplementary Conditions. sec Guide to the Preparation of Supplementary Conditions (No. 1910 -17) <br />(1996 Edition). <br />r <br />EJCDC No. 1910 -8 (1996 Edition) <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.